Maintenance for vacuum transfer pump main body

GN Vacuum pump is a good transfer way for solids control area

For vacuum pump service life longer, maintenance is the key segment to guarantee the vacuum pump running properly. It should be frequently to check and maintain the vacuum pump according to the instruction book. every vacuum pump package,this is the main measure to reduce the down time of the vacuum pump and keep equipment running properly all the time.

Points for maintenance

Requirement for maintenance staff

Should designate the technician who was trained with the vacuum pump technology to operate, manage and maintain the vacuum pump.

It’s only allowed for the designated and trained staff to operate and maintain the vacuum pump, and operate the equipment properly, strictly according to the operation use and maintenance procedure’s requirement

Purpose of maintenance

Vacuum should be periodically checked, maintained and serviced to guarantee the function and key parts and safeguard procedure of the vacuum pump under normal condition. And guarantee the vacuum pump working under good conditions and the guarantee the mechanical property and technical characteristic of the vacuum pump. Prolong the equipment longevity and lower the usage cost.

Maintenance method

A large scale maintenance should be done every 3 months, inspect the tank body, the usage of the combination of feed and suction pipe and discharge pipe, if found they are severely damaged,should exchange immediately.

Inspect if the exterior fasteners of the equipment are fastened properly once a month (600 hours)

Inspect the brake valve of air cylinder once a month(600 hours), if the movement is

flexible, if there is air leaking or water leaking, if there is block or leakage, should fix immediately.

Welcome to GN website to check more detail

Mud management/recycle system’s design

Drilling fluid was necessary for oil&gas drilling system,in some big HDD/TBM system,it was needed too

For the mud system’s design we need consider item as below:

1.hydrocyclone(desander/desliter)

When particle running at tydrocyclone,it will damage inwall of cone,normally the desander/desilter was made my metal material like gray iron or stainless steel,is hard enough,but service life will be short when treating some special mud,and fall off metal will effect density of mud,not suitable for some project

GN choose high quality PU material desander/desilter,to keep unit’s service life long enough,and keep mud’s state well

2.fluid surcafe balance

Most tank in solids control is top open design,the mud will freely move when overflow,GN have negative direction overflow design,untreated mud can’t move into clean mud,keep drilling work stable

3.cutting point

In some mini mud system,we will choose double deck shaker for solids control,the mesh’s choose was not like regular compound mode,the top deck need treat mud after hydrocyclone,the size should be small,the bottom deck is for untreated mud,size was bigger

4.total capacity

The mud cleaner can treat most mud and same tank’s top space,but in some condition,the solids part will carry more fluid after cleaner,because of not enough screen area,so in some deep drilling system,The desander and desiliter shoud install in different shaker,to keep treated solids more dry

5.tank volume

Some big dproject will need more fluid to support drilling,we will design longer storage tank,but with volume raise,the agitator/mud gun’s choose should be more,to keep mud mixing enough,like agitator’s impellar quantity will be 2,mud gun’s connect size should raise ,make mix power enough

GN will keep develop mud system,to bring better product for client

Shocking protection for solids control transportation

Shocking protection for solids control transportation is very important for equipment use,GN treat it seriously to give client best product

Most solids control equipment is working by physical way,and running by motor and bearing

For keep equipments running well and long service life,before shipment or transportation,must do necessary fix way to keep equipment stable,like decanter centrifuge/shale shaker/vertical cutting dryer

The shale shaker’s spring of basket is designed for work,when shipping by air/sea/truck,the sudden joit will damage it and the maintenance will need many cost and time

Most important work point of centrifuge is balance,if fixing bowl by bracer,it can keep main screw and bearing stable when transportation,raise service life of whole unit

Same like vertical cutting dryer,the most equipment related about motor and bearing,need keep stable state when transportation,to make sure the parts not damaged and keep balance

Some user didn’t know the shocking protection design of equipment,and cause the service life become very short by moving,so,the best way is apply the equipment supplier arrange engineer to jobsite and make lesson for everyone,it totally worth it,to reduce maintenance cost and better treatment result

There is some special shocking protect way like use deck to fix,like photo attached, Vertical cutting dryer with Mounted in a metal pallet during shipment,the pallet will remove when installing at skid

GN solids control will use professional design to give best protect for equipment,let client get perfect product

 

Control and set up of GN vacuum pump

GNSP Sludge Vacuum Pump is able to produce high vacuum up to 25”HG (Mercury Column) for transfer liquid, drilling cuttings, sludge and solids.

The pump is without any rotation items. With special structure design and powerful suction capability, it can be used at tough environmental for solids transfer, high working performance and less maintenance

It’s very important to learn right way to use the equipment,below was photo explain of vacuum pump

Manual control and setting of time controller

 

All valve will not move(open or close) after finished set 2 switch levers

Control switch lever as same as Form1,based on different use way and request,valve will change follow switch lever

Work mode Manual loading Manual unloading Auto
A/M Switch lever Switch to Manual Switch to Manual Switch to Auto
L/U Switch lever Switch to Loading Switch to Unloading Switch to Default
Gas gate valve Open Close
Feeding gate valve Open Close
Discharge gate valve Close Open
Gas jet tube ball valve Open Close
Discharge tube ball valve Close Open
Pressure number (Mpa) >0.55Mpa >0.55Mpa
Time test until 70% test until empty
Form 1

1.When loading mud,computing the time between vacuum tank empty to 70% full,to set L time controler

2.When unloading mud,computing the time between vacuum tank 70%full to empty,to set D time controler

3.The auto mode can go on when manual mode running well,control switch same to form1’s auto mode set

 

More detail,please contact GN solids control

Screw conveyor and use Area

In the solids control processing and waste management work systems, the screw conveyor are widely used in transporting main solid part. Screw conveyor also called auger. The out look of screw conveyor like long boxes connect together and with impeller in it, with rotation of the impeller, the materials can be transported to collecting tank/box.

Theauger could be positioned in with a slope, and within a certain slope angle, the materials could be transported to enough height. for practice, like in a generalized solids control system, the screw conveyor are used in different places as below:

  1. in WBM (water based mud) solids control system, the screw conveyor is also can be used to collect the drilling cuttings discharged from the desander and desilter,also the solids control centrifuge,and another auger is used to transport cutting to the solidification unit, normally is the final treatment for the drilling cuttings.
  2. when auger is always in slope situation, which is used in receiving the solids cuttings from shaker and feed it tovertical cuttings dryer.to reduce liquid part
  3. one set of screw conveyor used to collect solids cuttings from the shale shaker, and transport the80% dry cutting to tank or continue screw conveyor
  4. screw conveyor are also used to collect the drilling cuttings discharged sometime by the vertical cuttings dryer and waste managementhigh speed decanter centrifugeand deliver them to the solidification unit.

For screw conveyor,the solids part must be high enough,or most liquid part will go to bottom of unit,for this situation,we may consider sludge vacuum transfer pump

GN Solids Control is the manufacturer for solids control and waste management systems and solution in China. also GN solids control focus on provides complete closed loop of zero discharge solutions to oil and gas drilling industry. Such solution includes: the solids control systems for drilling rigs ranging from 500 HP(horse power) work over rig to 2000 HP deep oil and gas drilling rigs, the drilling cuttings waste management system for both WBM(water based mud) and OBM(oil based mud), solidification unit for final treatment of drilling cuttings, for drilling fluids, GN has dewatering unit and dewatering centrifuges of high speed. And GNSC series screw conveyors are greatly used in those GN systems.

More question,please click our website

How to choose air compressor for vacuum pump

GN solids control supply vacuum pump,have some advice for the pump user

Vacuum pump is a new way for transfer material like sludge or slurry,compare with auger(screw conveyor),the vacuum transfer pump can save more space and make transfer work more clean

The pump is without any rotation items. With special structure design and powerful suction capability, it can be used at tough environmental for solids transfer

The vacuum pump is not work alone,it need air compressor to feed the pump

Normally vacuum pump will have minimum request for air compressor, like 17mm³/min(600CFM) at 550Kpa-795Kpa(80-114PSI),it means advice user prepare air compressor can fit this air demand and pressure,or higher,then the vacuum pump can work stable

The transfer/discharge distance is not fixed,it will change based on different material,transfer material should have enough flowability,can’t make pipe block and poor flowability means shorder distance vacuum can transfer,normally the manufacture will test transfer distance by clean water,and mark MDD(maximum discharge distance),higher capacity air compressor can make MDD longer

 

The compressor will include 5 parts,then to feed pump:

1.Main compressor

2.Air tank

3.Pre-filter

4.Refrigerated

5.Micro-filter

Some manufacture will supply main compressor signally,so,please mention to get all 5 part,then the vacuum pump can running

The vacuum pump can transfer waste mud/solids,drilling fluid,or hazardous waste recovery,for oil sludge in tank bottom clean,even sand course,fine,conventional and frac sand is supported

More use way of vacuum pump,please contact GN solids control

TBM drilling

GN solids control can supply equipment for TBM drilling by mud system

There are two main methods : earth pressure balanced (EPB) and slurry type shield machine. Selection of shield method depends on surface conditions ,ground conditions, dimensions of the tunnel section,tunnel alignment , boring distanceand construction period. Both are closed-face type shield machines, meaning the “head” part of machine is “closed” and separated from the rear part of machine. The “head” has a working/running chamber filled with soil or slurry between the cutting face and bulkhead to stabilize the cutting face under soil pressure . The EPB type shield machine turns the excavated soil into mud pressure and holds it under soil pressure to stabilize the cutting surface. It have system to cut the soil, mixing system to mix the excavated soil into mud pressure, soil discharge solution system to discharge the soil and control system to keep the soil pressure uniform. Therefore, EPB may not be applicable for the rocky soil that is hard to turn the excavated soil into slurry or sludge. It can be used at ground predominated by clayer soil. The slurry kind shield machine, on the other way, uses the external pressurized slurry to stabilize the cutting face, similar to bored piles or diaphragm walls using bentonite to contain the trench wall. The slurry is circulated to transport the excavated soil by fluid conveyance. Besides having excavation system, the slurry type shield machine has slurry feed and discharge equipment to circulate and pressurize slurry and slurry processing equipment on the ground to adjust the slurry properties.

A tunnel boring machine (TBM), also known as a “mole”, is a machine used to excavate tunnels with a circular cross section through a variety of soil and rock strata. They may also be used for microtunneling. They can bore through anything from hard rock to sand. Tunnel diameters can range from a metre (done with micro-TBMs) to 19.25 metres to date. Tunnels of less than a metre or so in diameter are typically done using trenchless construction methods or horizontal directional drilling rather than TBMs.

Tunnel boring machines are used as an alternative to drilling and blasting (D&B) methods in rock and conventional “hand mining” in soil. TBMs have the advantages of limiting the disturbance to the surrounding ground and producing a smooth tunnel wall. This significantly reduces the cost of lining the tunnel, and makes them suitable to use in heavily urbanized areas. The major disadvantage is the upfront cost. TBMs are expensive to construct, and can be difficult to transport. The longer the tunnel, the less the relative cost of tunnel boring machines versus drill and blast methods. This is because tunneling with TBMs is much more efficient and results in shortened completion times, assuming they operate successfully.

Drilling fluid control for TBM

With TBM,sometime ,will use drilling fluid to keep press,GN solids control have centrifuge and other solids control equipment to join mud management system

In soft ground, there are three main types of TBMs: Earth Pressure Balance Machines (EPB), Slurry Shield (SS) and open-face type. Both types of closed machines operate like Single Shield TBMs, using thrust cylinders to advance forward by pushing off against concrete segments. Earth Pressure Balance Machines are used in soft ground with less than 7 bar of pressure. The cutter head does not use disc cutters only, but instead a combination of tungsten carbide cutting bits, carbide disc cutters, drag picks and/or hard rock disc cutters. The EPB gets its name because it uses the excavated material to balance the pressure at the tunnel face. Pressure is maintained in the cutterhead by controlling the rate of extraction of spoil through the Archimedes screw and the advance rate. Additives such as bentonite, polymers and foam can be injected ahead of the face to increase the stability of the ground. Additives can also be injected in the cutterhead/extraction screw to ensure that the spoil remains sufficiently cohesive to form a plug in the Archimedes screw to maintain pressure in the cutterhead and restrict water flowing through.

For solids control equipment with TBM,GN solids control can supply package system solution like shale shaker/centrifuge/vertical cutting dryer/other equipment to recycle drilling fluid,and treat waste ,please check more detail at GN solids control

The damage of oil sludge drilling waste

With oil&gas drilling work going,more sludge come out,and many company want to solve it,and contact GN,we are trying to supply suitable product and solution

Background:

The oil & gas demand increased year by year. Many countries increased offshore/onshore oil and gas development efforts, while a large number of mining also caused serious environmental become bad, to keep balance of development and environmental. In the development process, oil-based mud, hydraulic fracturing and other development methods will cause high pollution.the company and local government should treat it seriously

 

Solid hazard:

It will take up large area of valuable land if the sludge is bulky and directly discharged without treatment.also pollutes the surrounding soil/water/air. If stored in the open air, the sludge will directly pollute the land and the crude oil will cause damaging pollution to the surrounding vegetation.not adviced,and the quantity of solid part is not small

Gas hazards:

Sludge is associated with the formation of foul gases and can contaminate the surrounding soil, water and air. In the event of a fire, open-air stored sludge will burn with toxic gases such as sulfur and cause serious air pollution, The physical health poses a serious threat.the damage gas will effect cillage and city directly if didn’t do prepare

Other hazards:

The mud contains a large number of pathogens, parasites (eggs), copper, zinc, chromium, mercury and other heavy metals, salts and PCBs, dioxins, radionuclides and other toxic and harmful substances is difficult to degradation, serious pollution and the surrounding damage to the environment.also the damage’s continue time is very long,

As solids control equipment manufacturer,GN will try supply suitable product to keep environment better

Drilling fluids

GN focus on manage drilling fluid for rig

Contamination of drilling fluids with drilled cuttings is an unavoidable consequence of successful drilling operations. If the drilling fluid does not carry cuttings and cavings to the surface, the rig either is not “making hole” or soon will be stuck in the hole it is making. The drill cuttings that are separated from the drilling fluid on the surface by the soldis control equipment and some quantity of unrecoverable or economically unwanted drilling fluid are a major source of drilling waste. Drilled and formation solids that are sized smaller than can be removed by the solids control equipment are often reported as drill solids. Some quantitiy of drill solids will accumulate in the drilling fluid and must be removed by the solids control equipment or reduced in concentration by dilution.

 

Mainy drilling fluid is WBFs and OBFs

 

WBFs:Water-based fluids

Water-based fluids (WBFs) are used to drill approximately 80% of all wells. The base fluid may be fresh water, seawater, brine, saturated brine, or a formate brine. The type of fluid selected depends on anticipated well conditions or on the specific interval of the well being drilled. For example, the surface interval typically is drilled with a low-density water- or seawater-based mud that contains few commercial additives. These systems incorporate natural clays in the course of the drilling operation. Some commercial bentonite or attapulgite also may be added to aid in fluid-loss control and to enhance hole-cleaning effectiveness. After surface casing is set and cemented, the operator often continues drilling with a WBF unless well conditions require displacing to an oil- or synthetic-based system.

Oil-based systems were developed and introduced in the 1960s to help address several drilling problems:

 

Formation clays that react, swell, or slough after exposure to WBFs

Increasing downhole temperatures

Contaminants

Stuck pipe and torque and drag

 

OBFs:Oil-based fluids

Oil-based fluids (OBFs) in use today are formulated with diesel, mineral oil, or low-toxicity linear olefins and paraffins. The olefins and paraffins are often referred to as “synthetics” although some are derived from distillation of crude oil and some are chemically synthesised from smaller molecules. The electrical stability of the internal brine or water phase is monitored to help ensure that the strength of the emulsion is maintained at or near a predetermined value. The emulsion should be stable enough to incorporate additional water volume if a downhole water flow is encountered.

For better rig work,GN have package solution and equipment for drilling fluids