Recently, we have one overseas clients requiring one sets 500gpm mud recycling tank system for HDD project. The client is GN old client who bought one set 500gpm system 3 years before. Now, they need more equipment to support the upcoming new projects. Based on the former mud system, the clients give request on the technical parameters:
Part 1: Recycle unit:
Same layout as their original unit – shale shaker, shaker with desnader and desilter, 2x pumps for cyclone and 1x feed \ transfer pump
Delete the mud hopper
Size of 40ft container with locking device for track
Recycle unit will be 7.5m length and rest of the length will be flat skid for mount in Generator
Unit needs to have lifting hooks for crane
Feed hose entrance from pit and clean mud hose needs to be at the base floor height – unit is going to be mounting permanent on track.
Electrical panels must be height quality and have power socket for pit pump 22kw
Submersible slurry pump, or Pit pump 22kw x 2units
The width of the unit with the rail folded cannot be more then 2.5m
Total height of the unit 3.20m – so if volume size is changed please extend the length of the unit from 7.5m to more.