Drilling mud system design from Existing mud tank

A client from Korean need us to re-design his present mud storage tank and existing shale shaker to be a complete mud recycling system.

See more :Drilling mud  systems

GN Drilling Mud system design as following:

  • 1, About mud tanks capacity and numbers:

The mud system needs 2 tanks,1 recycling tank,1 storage tank. We design and make the recycling tank for you.
Recycling tank Dimensions: 8×2.2×1.8m , Capacity: 36m3
Storage tank: Your present container. We offer you drawing to redesign your container. It’s much easier to re-make your container to be a storage tank then to be a recycling tank.

  • 2.    IS Mud pump included in one mud tank ?

No. Please review our quotation for all equipments for a total mud system.

  • 4.    Is mud tank existed or will make newly?
  • 5.    If it make newly, I wonder how it takes period

Answer: Recycling tank is customized for you, we will make the recycling tank newly, but the recycling tank and other equipments are manufactured by different workforce at the same time. So totally, so it only takes 25 days to make the total mud system for you.

Drilling fluids(mud) Function and Type

Drilling fluid(mud) is an important component in the drilling process. The drilling fluids(mud) performance very important functions in oil gas drilling,and HDD(Horizontal directional drillling).

Drilling fluids(mud) Function

  • Remove cuttings from well
  • Suspend and release cuttings
  • Control formation pressures
  • Seal permeable formations
  • Maintain wellbore stability
  • Cool, lubricate and support the bit and drilling assembly
  • Transmit hydraulic energy to tools and bit
  • Ensure adequate formation evaluation
  • Control corrosion (in acceptable level)
  • Facilitate cementing and completion
  • Minimize impact on environment

Drilling fluids(mud) system function is for cleaning drilling mud,and recycling drilling fluids.

Drilling Fluid(mud) Types

There are several types of drilling fluids used depending on the drilling conditions encountered:

* Water-based muds are used most frequently. The base may be either:

o fresh water, or

o salt water.

* Oil-based muds. Continue reading “Drilling fluids(mud) Function and Type”

Drilling fluids system for trenchless equipment.

Drilling fluids system for trenchless equipment /HDD applications from GN are cusomized,cost-effective,and reliable spare parts are guaranteed.

GN solids Control mud system is divided into three divisions now:

The oil & Gas drilling fluids system is usually multi-tanks with explosion proof drilling mud equipments.

oil drilling mud system
oil drilling mud system

The HDD (Trenchless) mud recycling system is usually small unit,signle-tank mud system.

Features of GN Trenchless mud equipment.

Fetures of GN HDD mud Equipments

  • Customized System Type:From single tank mud system to multi-tanks system
  • Effective Equipments integration:Complete drilling mud equipments from a single source-GN Factory.
  • Cost-Effective Solution:China leading horizontal directional drilling mud system technology.
  • Assured customer service:We can send our experienced engineers for installation,and training up customer engineers.

    Trencheless mud system
    Trencheless mud system

The small signle-tank system is made with multi-fuctions:Bentonite jet mixing system,mud treatment equipment, and mud tank for recycling and storage.

Learn more about trenchless rig drilling fluids system.

oil gas drilling torch unit

The torch unit is also called electric ignition device,which is used for igniting gas in oil gas drilling.It marches the mud gas separator in oil gas drilling.

Learn more:Electric Ignition Device

Drilling mud gas torch
Drilling mud gas torch

Working procedure of drilling mud torch.

1. Have the flammable gas conveyed to the air intake of gas burner (torch) through the pipeline installed at the safe area.
2. Connect and start current transformation of electric ignition device and electric circuit of voltage amplification.
3. Open the liquefied gas pot and ignite fire-leading tube through operating electric ignite (ignition at first stage), or with the fire-leading gas valve of emptying gas directly opened, ignite fire-leading tube through electric igniter (ignition at first stage).
4. Open gas blown down valve and ignite the blown down gas through the flaming fire-leading tube (ignition at second stage).
5. Have the liquefied gas pot closed with fire-leading tube put out, letting the blown down flammable gas to freely burning.

Drilling mud gas drilling torch unit. for poor boy degasser.

Vermeer Beijing Manufacturer-Drilling rig HDD

An Indonesia clients ask us to contact Vermeer Beijing Manufacturer for HDD rig spare parts,they want to buy new HDD mud system from us,and want to replace some spare parts for their HDD Vemeer rig.

Vemeer China VBM Company,  is Balama VBM : Vermeer Beijing Manufacture Joint venture Vermeer USA with Balama China

HDD rig
HDD rig

As per our comunication before I want to inform below :
Now we have Vermeer HDD D130X150, this rig made from Vermeer Beijing Manufacture (VBM), joint venture vermeer and balama china, (www.balama.com). We use drill pipe : vermeer Firestick One Piece Drill Rods 88.90 mm x 6.09 meters.

I want to buy DCI Eclipse SST complate, but some of pieces equipment and tooling must be required for operation of the SST. Such as :
1. Non-magnetic housing for SST transmitter
2. Monel (non-magnetic drill rod) approximately 15 ft (3 m) long for use between the nonmag housing and the first drill rod. A second monel may be required if you are using a mud motor.
3. Mud Motor and Tricone Drill Head

Kindly you help me for check the spare parts and pricing in China by Vermeer Beijing Manufacturer?

HDD Mud System-GN Solids Control

HDD mud system and equipments are becoming a very important market for GN Solids Control, China  leading manufacturer  specializing  in complete line of  equipments for drilling mud system.GN Drilling mud equipments are widely used in oil & gas drilling,and HDD mud system.

HDD mud system
HDD mud system

Australian HDD drilling company inquiry for mud system

:
Can you please supply me pricing on your HDD horizontal directional drilling mud tank systems.
I am looking for small units that will clean 130 gal and larger units to clean up to 1000 gal per minute.

Indonesia HDD drilling contractor for mud system:

My Company is Contractor Horizontal Directional Drilling(HDD).I Am interesting with MUD Cleaner ZQJ250×100B.Please quote me and send information about this product to my Email.

Nice to hear your voice in phone. Thankyou for your quotation. As per our inquiry, I want to order completed this Solid system. Here, I attached the system from Mud Tech. The system consist of, mud shale shaker, desander, desilter, mud tank, mixing system, generator set, hopper etc. I hope you have the equivalent product, with the same capasity, realibility and performance. But I dont want skid mounted, and the system can do disassembly.

I hope you can submitted to me your quotation that equivalent product and performance.

After two days discussion,the Indonesia clients are going to order a complete HDD mud system from us in next week.

Mud handling equipment for 750 HP rig

Today,A client inquired us for Drilling rig 750 HP  Mud handling equipment

Drilling mud handling equipment
Drilling mud handling equipment

Mud gas separator (poor boy  degasser)

Capacity :  1.56 M3.

Mud Degasser handling gas in mud
1 EA. ZCQ1.5/5 Vacuum degasse
Type/size centrifugal pump: 2″X1.1/2″
Driven by electric motor
50 HZ.   –   22 KW.   –    380/660 V.

Drilling Mud system
Mud pumps
1 EA. Mud pump  –  SI PETRO.  –  CHINA.
3NB-500 mud pump
Max. flow rate: 4000 PSI.

2 EA. Mud Mixing pumps
Driven by motor : 73 HP.

1EA. Transfer pumps

SIZE : 2.1/2″ SHAFT. – 4″X3″X13″ CASING.
Driven by motor: 50 HP.

Mud tanks system
3 EA.  mud tankS
TOTAL VALUME : 167m3
DIMEN.: 12500×3200×3100mm

ACTIVE MUD TANK
Total capacity : 133 BBL.

Reserve
Total capacity  : 400 BBL.
W./MISSION PUMP 2500 4″X3″X13″ – 2.1/2″ SHAFT.

Sand trap
1 EA. sand pump
capacity : 40 BBL. Continue reading “Mud handling equipment for 750 HP rig”

Shale shaker Screen Factory

A Client from Venezuela wants to establish shale shaker screens factory with us.They are doing solids control equipments,and drilling mud system rental service.

About our shaker screens:

Inquiries as below:

We are looking the viability to establish a screen factory in Venezuela to supply screens to PDVSA and the local companies.

We are interested to receive information if your company could be interested on this national and socialist project. The actual exchange controls in the country is oriented to promote and increase the local production, we have a group of investors interested to participate on this Oil & Gas area project and are looking for the engineering project and the properly machinery, Venezuela have local suppliers for aluminum and steel that represent an advantage for the necesary base material.
We have experience on solids control equipment rental and repair of the traditional brands like: Derrick, Swaco, Brandt, Double life, Triton, etc.

Desander replacement for some worldwild brand Desander

Desander from Derrick,MI-Swaco,NOV Brandt are famous and widely used in drilling mud systems.

GN Desander is China typical hydrocyclone for drilling fluids solids control,As a top China Desander manufacturer,our Desander has the following benifits

Desander
Desander

1,Customized enough for almost any drilling situations.
2,Competive Price desander replacement for Derrick,Mi-Swaco,Nov Brandt desander
3,Oilfield projects proven efficient desanders
4,Fast and reliable service for desander spare parts.
5,Top quality shaker vibrating motor.

Contact to learn more about GN desander.

MI-Swaco Desander

The M-I SWACO D-SANDER* Models 2-12 and 3-12 are designed for high-volume continuous removal of sand and abrasive cuttings from drilling fluids — 95% of all particles to 74 microns and more than 50% of particles to 40 microns. The D-SANDER features your choice of two or three 12-in.- (304.8-mm-) diameter replaceable, wear-resistant, polyurethane hydrocyclones and quick-release stainless steel clamps for simplified changeout. They are a fundamentally important piece of a rig’s complete solids control package. They also help limit repair and replacement of pump parts damaged by abrasives-laden drilling fluids.

MI-Swaco desander models:

Name     Function/Application

2-12 SLANT D-SANDER     2-12 Slant-Mount D-SANDER
2-12 VERTICAL D-SANDER     2-12 Vertical-Mount D-SANDER
3-12 SLANT D-SANDER     3-12 Slant-Mount D-SANDER
3-12 VERTICAL D-SANDER     3-12 Vertical-Mount D-SANDER

 

 

NOV Brandt Desander

Desander, as stated earlier, have no moving parts. The larger the internal diameter (ID) of the desander is, the greater the amount of fluid it is able to process and the larger the size of the solids removed. Desanders (10 in. ID) are able to remove roughly 50 percent of those solids within the 40-50 micron range at a flow rate of 500 gallons per min (gal/min), while desilters (4 in. ID) are able to remove approximately 50 percent of those solids within the 15-20 micron range at a flow rate of 60 gal/min. Microfine separators (2 in. ID) are able to remove around 50 percent of those solids within the 10-15 micron range at a flow rate of 15 gal/min. Desanders are typically positioned next-to-last in the arrangement of solids control equipment, with mud decanter centrifuges as the subsequent processing unit. They are preceded by gas busters, gumbo removal equipment (if utilized),fluids  shale shakers, mud conditioners (if utilized) and degassers.

NOV® Brandt® manufactures desander in Conroe, Texas, USA. desanders are typically configured to meet the specifications demanded by the application. Usually, the desired flow rate determines the configuration of the cones, including the size utilized. desanders are just one of the many solids control and waste management offerings that NOV Brandt supplies to the oil and gas industry. NOV Brandt’s Quality Management System is ISO 9001-2000 certified.

Tri-Flo Mud System 1200 to 7000 Gallon

Tri-Flo drilling mud system ranges from  1200,1500,2500,4000,7000 Gallon,they are usually for HDD drilling mud cleaning.

GN Solids Control offers customized drilling mud system from small tank system to large tank system similar like the Tri-Flo rangles for HDD.

Learn more:HDD mud system

  • Tri-Flo 1200 Gallon mud system
    Tri Flo mud system
    Tri Flo mud system

Tri-Flo 1200 Gallon Mud SystemThe equipment is based upon the highly successful Tri-Flo 1200 Gallon Mud System which has the following advantages:

Drilling mud equipments:

Pre-screening of the returned mud using a Tri-Flo 123 Shale Shaker.

Secondary cleaning of the returned mud using a Tri-Flo 4 x 4″ Mud Cleaner.

Integral mixing system using a Tri-Flo 3″ Jet Mixing Hopper.

A total of 1200 US gallons (4,500 litres) is provided, with a division separating the clean mud from the dirty mud in the ratio 60:40.
This provides the optimum balance for most drilling operations.

Output: Up to 150 USgpm (560 litres/min)

Cut Point: 16 microns

Dimensions: 3700L x 1900W x 2800H. 2750kg weight(empty)

Capacity: 1200 US gallons (4,500 litres)

Pumps: Two 2” x 3” centrifugal pumps with 7.5kW motors. A power socket for a third pump is provided.

Power: Integral control panel for all electrical functions. Generator required, approx 50-kVA

  • Tri-Flo 1500 Gallon Mud System

Pre-screening of the returned mud using a Tri-Flo 123 Shale Shaker.

Secondary cleaning of the returned mud using a Tri-Flo 4 x 4″ Mud Cleaner.

Integral mixing system using a Tri-Flo 3″ Jet Mixing Hopper.

A total of 1500 US gallons (5,700 litres) is provided, with a division separating the clean mud from the dirty mud in the ratio 60:40.
This provides the optimum balance for most drilling operations.

Integral charge pump to supply clean mud back to the drilling rig.

This provides a continuous supply of clean mud under pressure to the high pressure mud pump, avoiding problems of starvation and cavitation which can rapidly cause damage.

Specifications

Output: Up to 150 USgpm (560 litres/min)

Cut Point: 16 microns

Dimensions: 3850L x 1800W x 2862H

Capacity: 1500 US gallons (5,700 litres)

Pumps: Three 2 x 3″ centrifugal pumps with 5.5kW motors Continue reading “Tri-Flo Mud System 1200 to 7000 Gallon”