truck mounted mud system

For HDD(Horizontal Directional Drilling),People sometimes uses Truck mounted drilling mud system for recycling drilling mud while drilling.The trenchless drilling mud system is usually very portable with small treating capacity,but very convenient for moving.

Inquiry for truck mounted drilling mud system shaker.

Truckmounted mud system
Truckmounted mud system
I’m assembling a drilling support vehicle (truck with mud system)  here and plan to install a mud shale shaker on the truck. This is for geothermal drilling. The advice I am getting from our polymer specialist is that for our typical geologies here in UK ( clays and shales ) the cuttings can be removed – if using a fine enough screen – directly by the shale shaker. ( i.e. the polymer ecapsulates the cuttings and we do not plan to use a de-sanding(desander) or de-silting (desilter) cyclones above the shaker ).
For the truck mounted mud system a shale shaker is being proposed to us with a high capacity is fitted with 5 screens. So although our flow is only 40 m3/hr ( 170 GPM) but the shaker nominal treating capacity  is 3 or 4 times higher.
This approach interests me but I think that the shale shaker which may be proposed to me will be more than my budget. I am interested in your equipment for truck mounted drilling mud system and I would be most grateful if you would advise me of: Continue reading “truck mounted mud system”

Diesel Electrical Land Drilling Rig

A Client from Indian ask us for Tendering Diesel Electrical Land Drilling Rig and mobile drilling rig.

We offer drilling rig mud system package

land drilling rig
land drilling rig

There will be Tender coming from Oil India Ltd. in one and a half months’ time.  This tender is mainly for buying a 2000 HP Diesel Electrical Land drilling Rig with 1000 KBPS Mast and Substructures conforming to API 4E or 4F with optional VFO and also one 750 HP Mobile drilling Rig.  The specification is under preparation.

Customer have put a restriction that they will prefer a company who has 15 years API Certificate in offering drilling rigs.

The local job of the  Diesel Electrical Land Rig and mobile rig can be arranged by us to reduce the cost. Continue reading “Diesel Electrical Land Drilling Rig”

Shale Shaker compatible with Replacement shaker Screen fit for Derrick shale shaker

GN ZS70×105-3 shale shaker is compatible with replacement shaker screens fit for  Derrick FLC 2000 series shale shaker.

Thanks for your reply for asking for Shale Shaker compatible with Derrick shaker Screen ;
A)   Are the quoted shakers compatible with Derrick screens?
I quoted our another shaker :ZS70×105-3 model compatible with Derrick screens,Which is similar to Derrick FLC 2000 3 Panels shaker.
B)    Can you supply the prices of the screens?
In the shaker quotation,you’ll see the shaker screen unit price and screen life.,we also enclosed 3 kinds of screens which can all be used in our shaker
C)   Do you have a comparison table for your Equipment Vs Derrick performances?
ZS70×105-3 model is similar,but treating capacity do not as high as Derrick. GN VS Derrick about 1 VS 1.15.
D)   Can you please quote the price of the Decanting Centrifuges of your catalog?
Do you have a price list for your other products?
We might have urgen t need of mud Tanks, Mixing hopper, Agitators etc.

Decanter centrifuges for slurry separation

Inquiry from clients of Decanter centrifuges for slurry separation

We are looking for a Decanter centrifuge suitable for foundation industry. We are a Qatar based construction company involved in the deep foundation for high rise buildings, bridges, industrial plants etc. We are using world renowned drilling machines from Bauer Germany and SANY china for drilling the vertical holes in the ground to a depth of ranging from 15 meter ~65 meter. We have got diaphragm wall cutters to do the rectangular vertical drilling in the ground. We normally use bentonite or polymer slurry during drilling. We are already using Desanders & desilters for separating the solids from slurry to make it reusable. Continue reading “Decanter centrifuges for slurry separation”

Dredge Dewatering System and Equipments

Dredge dewatering system are Integrated from Dredged slurry Separation equioments. As a drilling mud system manufacturer,we are now moving to a new division of slurry separation for Dredge dewatering system.

Contact now:Dredged dewatering Equipments Sales

The dredge dewatering Equipments

Dredged slurry tanks (Ladder、slide walk、handrail、valve, mud pipe line, clean gate)

Dredge Dewatering System
Dredge Dewatering System

Sand Pumps,Centrifugal pump
Electrical Requirements:460v, 60 Hz, 3Ph, 350 Amps or 380v, 50 Hz, 3Ph
Solid Separation Equipment
Two ZS Scalping Shakers model ZS830×108-3
2 Desanders with ZS830×108-3 Shakers
2 Desilter with ZS830×108-3 Shakers
Thru put Dredged slurry Dewatering Capacity
2000 gallons per minute, continuous.
Slurry Agitators
Two 7.5kw with double impeller
Solids Loading in Feed
15% by weight for best performance
Mud Guns

Features of Dredge Dewatering System Continue reading “Dredge Dewatering System and Equipments”

Dredged slurry Separation system

Dredged slurry Separation system is one division of GN mud separation market.We manufacture Dredged slurry Separation equipments and system in China based factory,and ship our slurry separation system and equipments

Dredged slurry Separation system
Dredged slurry Separation system

around the world

GN Dredged slurry Separation system

The GN 2000 GPM dredged slurry separation system has been designed specifically to accept feed directly from the dredge at a maximum rate  2000 gpm, GN slurry separation system unique self contained solid removal technology separates solids from dredged slurry via a three stage system down to 25 um. In addition, the solids that are removed are dewatered to a stackable “pass paint filter” state, which can be readily moved with front end loader, conveyor and/or dump trucks. The effluent or discharged fluid is pumped off by a centrifugal pump. The separation process is continuous and operates completely mechanically without any chemical enhancement. The entire dredged slurry separation system is designed onto a “rock over” type trailer that is highway legal for ease of transporting.
Continue reading “Dredged slurry Separation system”

Drilling Cuttings Screw Conveyors

We are looking for Drilling Cuttings Screw Conveyors partner,since we are solids control system manufacturer.When designing a total mud system,we need to integrate drilling cuttings screw conveyors.

  1. Drilling Cuttings Screw Conveyors (Augers)

1 x ±24ft screw type cutting conveyor fitted with independent electrical motor and with sensor capable to stop the engine if any alien body is engaged into the screw.

Conveyor should be calculated to absorb overflow of cuttings when drilling 26” or 17” hole (1000gpm flow rate).

1 x ±36ft screw type cutting conveyor as above.Which are used before the drilling mud shale shakers.

We only work with manufacturer for drilling type cuttings converor,if you are interested,please send your info. to info@gnsolidscontrol.com.

linear motion mud cleaner

INEAR MOTION MUD CLEANER (LMMC)

A SCOPE & APPLICATION of  mud cleaner:

This specification covers the minimum requirement for procurement of the complete unit of Linear Motion Mud

Linear motion mud cleaner
Linear motion mud cleaner

Cleaner to remove fine drilled solids or silts from the drilling fluid by a combination of hydro cyclones and screening, operating continuously at specified rated conditions

Linear motion shale shaker  GENERAL FEATURES:

1.   Linear Motion Mud Cleaner Unit (LMMCU) shall be new & of recent manufacture (not older than one year on the date of shipment/inspection whichever is later).

2    Any item not included in the specification and considered as necessary insurance for ensuring the operation of the mud cleaner shall be included in the supply list & quoted separately in the offer.

3     The details of repair procedure & standard recommended practices to be incorporated in O & M Manual.

4.   Manufacturer to be provide operational spares for continuous duty operation of 01 year along with their part numbers & quantity in the Offer of mud cleaner for solids control system

5    Manufacturer to ensure that mud cleaner shall have minimum of 10 years design life under specified operating conditions.

Matching shale shaker of the mud cleaner should be linear motion shaker.

Centrifugal pumps butterfly valves for mud system

As mud system manufacturer,GN also supply centrifugal pumps and butterfly valves.Below is American clients inquiry for centrifugal pump and butterfly valves.
Please quote following centrifugal pump/valves for mud system.
1) Centrifugal pump 8″ suctionx 6″discharge line with 12″ Impeller and mechanical seals for hopper and supercharger of mud pump:- Quantity 10 Nos.
2) Centrifugal pump 8″ suction x 6″ discharge line with 14″ Impeller and mechanical seals for mud tank hopper:- Quantity 6 Nos.

butterfly valves
butterfly valves

3) Centrifugal pump 3″ suction and 2″ discharge with 14″ Impeller with mechanical seals for water tank:- Quantity 10 nos
4) Butterfly Valve 150 class 10″ with lugged type lever operated:-40 Nos
5) Butterfly Valve 150 class 8″’ with lugged type lever operated:-80 Nos
6) Butterfly Valve 150 class 6″ with lugged type lever operated:-120 Nos7) Butter fly Valve 150 class 3″ with lugged type lever operated:-48 Nos
Contact us to get the right model Centrifugal pump and Butter fly Valve for your drilling mud system.

Mud trip tank for drilling mud system

GN design drilling mud trip tank for petroleum drilling mud circulation system.GN mud agitators and centrifugal pumps are components for  the mud trip tank .With GN experienced engineers,our selection for the mud mixers and trip pumps are compatible for the trip tank.

Drilling mud trip tank definition

Drilling mud trip tank is a small mud tank with a capacity of 10 to 15 barrels, usually with 1-barrel or H-barrel

Mud Trip tank
Mud Trip tank

divisions, used to ascertain the amount of mud necessary to keep the wellbore  full with the exact amount of mud that is displaced by drill pipe. When the bit comes out of the hole, a volume of mud equal to that which the drill pipe occupied while in the hole must be pumped into the hole to replace the pipe. When the bit goes back in the hole, the drill pipe displaces a certain amount of mud, and a trip tank can be used again to keep track of this volume. Continue reading “Mud trip tank for drilling mud system”