GN ZS70×105-3 shale shaker is compatible with replacement shaker screens fit for Derrick FLC 2000 series shale shaker.
Thanks for your reply for asking for Shale Shaker compatible with Derrick shaker Screen ;
A) Are the quoted shakers compatible with Derrick screens?
I quoted our another shaker :ZS70×105-3 model compatible with Derrick screens,Which is similar to Derrick FLC 2000 3 Panels shaker.
B) Can you supply the prices of the screens?
In the shaker quotation,you’ll see the shaker screen unit price and screen life.,we also enclosed 3 kinds of screens which can all be used in our shaker
C) Do you have a comparison table for your Equipment Vs Derrick performances?
ZS70×105-3 model is similar,but treating capacity do not as high as Derrick. GN VS Derrick about 1 VS 1.15.
D) Can you please quote the price of the Decanting Centrifuges of your catalog?
Do you have a price list for your other products?
We might have urgen t need of mud Tanks, Mixing hopper, Agitators etc.
We are looking for a Decanter centrifuge suitable for foundation industry. We are a Qatar based construction company involved in the deep foundation for high rise buildings, bridges, industrial plants etc. We are using world renowned drilling machines from Bauer Germany and SANY china for drilling the vertical holes in the ground to a depth of ranging from 15 meter ~65 meter. We have got diaphragm wall cutters to do the rectangular vertical drilling in the ground. We normally use bentonite or polymer slurry during drilling. We are already using Desanders & desilters for separating the solids from slurry to make it reusable. Continue reading “Decanter centrifuges for slurry separation”
Dredge dewatering system are Integrated from Dredged slurry Separation equioments. As a drilling mud system manufacturer,we are now moving to a new division of slurry separation for Dredge dewatering system.
Sand Pumps,Centrifugal pump
Electrical Requirements:460v, 60 Hz, 3Ph, 350 Amps or 380v, 50 Hz, 3Ph
Solid Separation Equipment
Two ZS Scalping Shakers model ZS830×108-3 2 Desanders with ZS830×108-3 Shakers
2 Desilter with ZS830×108-3 Shakers
Thru put Dredged slurry Dewatering Capacity
2000 gallons per minute, continuous. Slurry Agitators
Two 7.5kw with double impeller
Solids Loading in Feed
15% by weight for best performance
Mud Guns
Dredged slurry Separation system is one division of GN mud separation market.We manufacture Dredged slurry Separation equipments and system in China based factory,and ship our slurry separation system and equipments
around the world
GN Dredged slurry Separation system
The GN 2000 GPM dredged slurry separation system has been designed specifically to accept feed directly from the dredge at a maximum rate 2000 gpm, GN slurry separation system unique self contained solid removal technology separates solids from dredged slurry via a three stage system down to 25 um. In addition, the solids that are removed are dewatered to a stackable “pass paint filter” state, which can be readily moved with front end loader, conveyor and/or dump trucks. The effluent or discharged fluid is pumped off by a centrifugal pump. The separation process is continuous and operates completely mechanically without any chemical enhancement. The entire dredged slurry separation system is designed onto a “rock over” type trailer that is highway legal for ease of transporting. Continue reading “Dredged slurry Separation system”
We are looking for Drilling Cuttings Screw Conveyors partner,since we are solids control system manufacturer.When designing a total mud system,we need to integrate drilling cuttings screw conveyors.
Drilling Cuttings Screw Conveyors (Augers)
1 x ±24ft screw type cutting conveyor fitted with independent electrical motor and with sensor capable to stop the engine if any alien body is engaged into the screw.
Conveyor should be calculated to absorb overflow of cuttings when drilling 26” or 17” hole (1000gpm flow rate).
This specification covers the minimum requirement for procurement of the complete unit of Linear Motion Mud
Cleaner to remove fine drilled solids or silts from the drilling fluid by a combination of hydro cyclones and screening, operating continuously at specified rated conditions
Linear motion shale shaker GENERAL FEATURES:
1. Linear Motion Mud Cleaner Unit (LMMCU) shall be new & of recent manufacture (not older than one year on the date of shipment/inspection whichever is later).
2 Any item not included in the specification and considered as necessary insurance for ensuring the operation of the mud cleaner shall be included in the supply list & quoted separately in the offer.
3 The details of repair procedure & standard recommended practices to be incorporated in O & M Manual.
4. Manufacturer to be provide operational spares for continuous duty operation of 01 year along with their part numbers & quantity in the Offer of mud cleaner for solids control system
5 Manufacturer to ensure that mud cleaner shall have minimum of 10 years design life under specified operating conditions.
As mud system manufacturer,GN also supply centrifugal pumps and butterfly valves.Below is American clients inquiry for centrifugal pump and butterfly valves.
Please quote following centrifugal pump/valves for mud system.
1) Centrifugal pump 8″ suctionx 6″discharge line with 12″ Impeller and mechanical seals for hopper and supercharger of mud pump:- Quantity 10 Nos.
2) Centrifugal pump 8″ suction x 6″ discharge line with 14″ Impeller and mechanical seals for mud tank hopper:- Quantity 6 Nos.
3) Centrifugal pump 3″ suction and 2″ discharge with 14″ Impeller with mechanical seals for water tank:- Quantity 10 nos
4) Butterfly Valve 150 class 10″ with lugged type lever operated:-40 Nos
5) Butterfly Valve 150 class 8″’ with lugged type lever operated:-80 Nos
6) Butterfly Valve 150 class 6″ with lugged type lever operated:-120 Nos7) Butter fly Valve 150 class 3″ with lugged type lever operated:-48 Nos
Contact us to get the right model Centrifugal pump and Butter fly Valve for your drilling mud system.
GN design drilling mud trip tank for petroleum drilling mud circulation system.GN mud agitators and centrifugal pumps are components for the mud trip tank .With GN experienced engineers,our selection for the mud mixers and trip pumps are compatible for the trip tank.
Drilling mud trip tank definition
Drilling mud trip tank is a small mud tank with a capacity of 10 to 15 barrels, usually with 1-barrel or H-barrel
divisions, used to ascertain the amount of mud necessary to keep the wellbore full with the exact amount of mud that is displaced by drill pipe. When the bit comes out of the hole, a volume of mud equal to that which the drill pipe occupied while in the hole must be pumped into the hole to replace the pipe. When the bit goes back in the hole, the drill pipe displaces a certain amount of mud, and a trip tank can be used again to keep track of this volume. Continue reading “Mud trip tank for drilling mud system”
Mud gas separator sizing and design selection is important for petroleum well drilling.Welcome to consult GN for the right sizing and fit design for your mud gas separator in oilfield drilling mud.
Recent wellsite disasters have led to an increased emphasis on properly sized mud/gas separators. To assure safty,we
should know mud/gas separator technology and recommends separator configuration, components, design considerations, and a sizing procedure. A simple method of evaluating mud/gas separation within the separator vessel has been developed as a basis for the sizing procedure. A mud/gas separator sizing worksheet will assist drilling personnel with the sizing calculations. The worksheet provides a quick and easy evaluation of most mud/gas separators for a specific well application. A brief discussion of other mud/gas separator considerations is provided, including separator components, testing, materials, and oil-based-mud considerations.
The mud/gas separator is designed to provide effective separation of the mud and gas circulated from the well by venting the gas and returning the mud to the mud pits. Small amounts of entrained gas can then be handled by a vacuum-type degasser located in the mud pits. The mud/gas separator controls gas cutting during kick situations, during drilling with significant drilled gas in the mud returns, or when trip gas is circulated up. Continue reading “Mud Gas Separator Sizing & Design”
The drilling mud Cleaning unit performs the function of receiving drilling mud from the well and clean it from cuttings.
The mud cleaning unit first tank has three-section container consists of compartments, two of which have a height of 0,9 m and the volume of 4,5 m each, and the third – the height of 1,6 m and the volume of 9 m3. The design capacity of Uneven compartments was adopted based on the technological features of the Continue reading “Drilling mud cleaning unit”