Effective Drilling rig Solids Control System

When design Solids control system for oilfield drilling rig,we Consider the following factors for customer.

oilfield drilling rig
oilfield drilling rig

1.    Obtain solids removal equipment for your operation

2.    Remove as many drilled cuttings as possible before being pumped back down the bore hole
3.    Do not by pass the shale shaker or other solid control equipment while drilling
4.    Use the smallest mesh screen possible on the shale shaker.  This will change from formation to formation
5.    Maintain an adequate inventory of recommended spare parts.

6.    Train & assign rig personnel to be responsible for equipment operation & maintenance

Now GN solids Control market keeps growing internationally ,welcome to join us and be our equipment agent or representative in your own country.High quality,and best price  Effective Drilling rig Solids Control System

Leave a Reply

Your email address will not be published. Required fields are marked *