Jul 23

Work over drilling rig mud system is also one kind of solids control system in drilling work. And GN Solids Control is professional at this kind of mud system. After 2 mud tank systems for workover drilling rig to Indonesia, and Drilling mud system and mud mixing system for Australia,  today Another 2 Sets XJ550 HP Petroleum Workover Drilling rig solids control mud system are finished within 40 days ready for delivery to Kazakhstan.

workover rig mud systemThe workover rig mud system is usually contains shale shaker, decanter centrifuge, and mud tank. The desander and desilter is optional, it depends on the environment you faced.

As you may have noticed, we have send the work over rig mud system to two different place, Indonesia and Kazakhstan. South, North,and Middle of the earth, hot and cold. GN Solids Control can supply all the equipments customized, wherever you are, Indonesia or Kazakhstan, south or north of the earth,or you are in the coldest area or hottest area, you need, and GN do it, what’s more, do it perfect! Continue reading »

  • Share/Bookmark

written by admin \\ tags: , , , , ,

Jun 09

How mud tank works, it is a very easy question, but it contains some good questions behind, so we get all these resolved. First we should know the feature of mud tanks, than the components, how it works in the solids control system, what the main fuction is, last but not least how to clean the mud tank.

Mud Tank Feature

A mud tank is an open-top container, typically made of steel, to store drilling fluid on a drilling rig. They are also called mud tankmud pits, because they used to be nothing more than pits dug out of the earth. The mud tank is devided into Square tank and Cone-shaped tank according to the shape of tank bottom. The body of the tank is made of welding the steel plate and section, using the flat cone-shape structure or the corrugated structure.

Components of Mud Tank

The mud tank surface and the passage are made of the slipping resistant steel plate and linearity netted steel plate which is produced by the professional factory, the mud tanks are made of the side steel pipe, all of the structure can be folded without barrier and pegged reliably. The surface of tank is equipped with water pipeline for cleaning the surface and equipment on the mud tank, we use soaked zinc processing for the netted steel plate. The ladder is made of Continue reading »

  • Share/Bookmark

written by GN solids Control \\ tags: , , , , ,

Apr 22

Our customers are always asking questions like: Can I have your reference list? Are your products adapt to our situation?  and so on… I konw what they really want to know: Why I choose GN Solids Control, and is there others used your products and do they satisfied with it?

Here we go!

Firstly, I will introduce you the principle of GN Solids Control: Only Top Quality Products! This is our promise!

Secondly, GN Solids Control supply all the parts of solids control system, including shale shakers, desanders, desilters, mud tank separation, centrifugal pumps, decanting centrifuges and so on, and GN supply all the products right as you required.

Shale shaker,linear motion shaker

Drilling mud shale shaker manufacturer,linear motion shale shakers for drilling fluids,Solids control shale shaker,oilfield drilling cuttings linear motion

Derrick Replacement 503 PMD shaker screen to Brazil

Twin drilling mud shale shaker and backup spare parts to Morocco

desander,hydrocyclone desander,China desander desilter manufacturer

Hydrocyclone desander manufacturer,oilfield desander with good cones,buy solids control drilling mud fluids desander from China supplier for sale.

desilter-hydrocyclone fluids desilter,drilling mud desilter

Hydrocyclone desilter manufacturer,drilling fluids desilter,mud desilter and desander with good cones,China oilfield solids control desilter supplier.

mud tank,drilling fluids tank,mud tanks design

Drilling Mud tank manufacturer,drilling fluids tanks customized design,design mud tanks for Oil Gas drilling and HDD Solids Control mud system.

Storage mud tank agitator to Thailand

Premix mud tank equipments and spare parts to Kazakstan

Drilling mud tank recycle systems equipments for Kazakhstan

Our customer is all over the world, as you can see, and click here to know more about GN news…

  • Share/Bookmark

written by GN solids Control \\ tags: , , , , ,

Mar 08

The mixing and reserve mud tank is after :Drilling mud suction Tank(2) for the 1000HP (ZJ40) Drilling rig mud system.500 bbls. three (3) compartment reserve tank, 10’ wide x 8’ deep x 37’ long mounted on a 40’ skid per above general specifications and including:

Mixing and reserve tank compartment:

water tank

water tank

150 bbls mixing compartment

175 bbls reserve #1 compartment

175 bbls reserve #2 compartment

one (1) full partition with bottom equalizer on reserve tanks.

top grating includes tubing handrials and toe boards.

one (1) stair to ground with handrials.

removable walkway with handrials to suction tank.

one (1) 1’’ diameter x 25’ long valved water washdowen hose.

16’’ x 18’’ mud ditch with 10’’ dump gate to each compartment.

three (3) psi 10 hp mud agitator supplied and mounted on tank. two (2) in reserve tank compartment and one (1) in mixing compartment.

two (2) 3’’ bottom mud guns with butterfly valves.

three (3) 10’’ butterfly valve clean-out gates – one (1) each in compartment.

one (1) 12’’ bottom equalizer to suction tank.

two (2) 6’’ hopper to suck mix mud in any tank.

two (2) 8×6 centrifugal pumps with mechanical seals, each powered by a 100 hp, 1800 rpm, 480 volt, 3-phase, 60 hz xp ac motor supplied and mounted on tank porch for mud mix.

one (1) 12’’ dich connection to suction tank.

one (1) 6’’ mud gunning line connection to suction tank.

one (1) 2’’ water line connection to suction tank.

Mud Tank

by George Trist

Mud tank is a basic part of solids control system or other equipments alike. It is widely used. How mud tank works, it is a…
  • Share/Bookmark

written by GN solids Control \\ tags: ,

Mar 03

Drilling mud suction tank is the requirements of our client mud system second tank.The first tank :Oilfield shale shaker tank (1).

Details of the mud suction tank for the 1000HP drilling mud system.

500 bbls mud suction tank. three (3) compartment suction tank with two (2) 15’-6’’ long x 10’ wide x 8’ high suction

drilling mud suction tank

drilling mud suction tank

compartment and one (1) 8’ long x 10’ wide x 8’ high pill compartment mounted on a 40’ skid per above general spesifications and including:
top grating. includes tubing handrials and toe boards.
one (1) psi 10 hp mud agitator supplied and mounted in pill compartment.
one (1) psi 10 hp agrtator supplied mounted in each suction compartment.
three (3) 3’’ bottom mud guns with butterfly valves.
three (3) 10’’ butterfly valve clean-out gates – one (1) in each compartment.
two (2) 10’’ suction lines, one (1) for each mud pump.
mud pump to be capable of suching from any compartment.
one (1) mud lap on suction tank with 1’’ water tap.
8’’ suction line in each compartment of the suction tank for mud mix. Continue reading »

  • Share/Bookmark

written by GN solids Control \\ tags: , , , ,

Feb 27

We will update info about a total mud system for our clients from Libya from today.Today is description of the shale shaker tank.

General requirements for all mud tanks.

shale shaker tank

shale shaker tank

Three-runner oilfield type, 7’-10’’ wide with a 6’’ loading hich on each and for tailboarding. skid extenions decked with ¼’’ plate. tank walls rimmed with 7’’ square tubing full length of tanks.tanks side and end walls constructed of ¼’’ crimped plate for rigidity.

Detail requirements for the shale shaker tank.

520 bbls four (4) compartment shaker tank, 10’ widex 8’ deep x 37’’ long mounted on a 40’ long skid per above general spesifications and including.
tank compartments as follows:
91 bbls sand trap compartment
143 bbls degasser compartment
143 bbls desander compartment
143 bbls desilter compartment
three (3) full partition with equalizer valves

Continue reading »

  • Share/Bookmark

written by GN solids Control \\ tags: , , ,

Jan 06

1, Dimensions for our normal  shale shaker as enclosed files. For your truck mounted drilling mud system we can customize the shaker as below.

ZS70x105-3 shale shaker: L×W×H(2385×1800×1200mm)

To lower the height we cut the skid for the shaker,and fix the shaker on the sump without skid,and also make the motor to be the highest point.(Which similar like the enclosed pictures).To do this,the shale shaker is fixed on the mud tank,so it would be better for us to make the mud tank and the shale shaker unit for you.The total mud system unit can be put in one container.(Quotation as enclosed).

2, .People usually do not use a shale shaker more then 4 screens.For 4 screens or more then that, as the mud loading is very big,it influences the shale shaker life dramatically.(Even Brandt shale shaker has such problems).So people prefer to use more shakers, not more screens shaker.For your mud system,the ZS70x105-3 treating capacity is big enough.

3, To buy more shale shaker screens later ( after the 1st sets are used up) what would is the minimum order value for a batch of shale shaker screens if sent by UPS using our UPS a/c number ? No Minimum Order limited, fast and reliable spare parts for our clients are guaranteed.

Clients Reply for customized shale shaker for drilling mud system solution: Continue reading »

  • Share/Bookmark

written by GN solids Control \\ tags: , ,

Dec 15

GN design drilling mud trip tank for petroleum drilling mud circulation system.GN mud agitators and centrifugal pumps are components for  the mud trip tank .With GN experienced engineers,our selection for the mud mixers and trip pumps are compatible for the trip tank.

Drilling mud trip tank definition

Drilling mud trip tank is a small mud tank with a capacity of 10 to 15 barrels, usually with 1-barrel or H-barrel

Mud Trip tank

Mud Trip tank

divisions, used to ascertain the amount of mud necessary to keep the wellbore  full with the exact amount of mud that is displaced by drill pipe. When the bit comes out of the hole, a volume of mud equal to that which the drill pipe occupied while in the hole must be pumped into the hole to replace the pipe. When the bit goes back in the hole, the drill pipe displaces a certain amount of mud, and a trip tank can be used again to keep track of this volume. Continue reading »

  • Share/Bookmark

written by GN solids Control \\ tags: , , , ,

Nov 27

Drilling mud vacuum tank degasser is one type of degasser in oil gas drilling fluids system.Another type of degasser is called Atmospheric Degasser.

Both of the vacuum degasser are devices that removes air or gases (methane, H2S, CO2 and others) from drilling fluids. There are two generic types that work by both expanding the size of the gas bubbles entrained in the mud (by pulling a vacuum on the mud) and by increasing the surface area available to the mud so that bubbles escape (through the use of various cascading baffle plates). If the gas content in the mud is high, a mud gas separator or “poor boy degasser” is used, because it has a higher capacity than standard degassers and routes the evolved gases away from the rig to a flaring area complete with an ignition source.

GN Drilling mud vacuum degasser.

ZCQ240 Degasser

Vacuum tank degasser

Vacuum tank degasser

ZCQ270  Degasser

ZCQ300 Degasser

ZCQ360 Degasser.

Vacuum Tank Degasser

Vacuum Type is the most common form of degasser. It can be horizontal, vertical or round vessel. A vacuum action is created to pull in the gas cut mud. When the liquid enters the tank it will flow and be distributed to a layer of internal baffle plates designed for the mud to flow in thin laminar film and is exposed to a vacuum that forces the gas to escape and break out of the mud.The vacuum pump moves the escaping gas from the vessel discharging it to the rig’s flare or environmental control system.

Derrick mud vacuum tank degasser.

Continue reading »

  • Share/Bookmark

written by GN solids Control \\ tags: , , ,

Nov 26

A client from Korean need us to re-design his present mud storage tank and existing shale shaker to be a complete mud recycling system.

See more :Drilling mud  systems

GN Drilling Mud system design as following:

  • 1, About mud tanks capacity and numbers:

The mud system needs 2 tanks,1 recycling tank,1 storage tank. We design and make the recycling tank for you.
Recycling tank Dimensions: 8×2.2×1.8m , Capacity: 36m3
Storage tank: Your present container. We offer you drawing to redesign your container. It’s much easier to re-make your container to be a storage tank then to be a recycling tank.

  • 2.    IS Mud pump included in one mud tank ?

No. Please review our quotation for all equipments for a total mud system.

  • 4.    Is mud tank existed or will make newly?
  • 5.    If it make newly, I wonder how it takes period

Answer: Recycling tank is customized for you, we will make the recycling tank newly, but the recycling tank and other equipments are manufactured by different workforce at the same time. So totally, so it only takes 25 days to make the total mud system for you.

  • Share/Bookmark

written by GN solids Control \\ tags: , , ,