GN Solids Control got repeated 5 sets 500gpm Mud System working for Water Well Drilling in Middle East. The client is local strong contract company having good relations with Local government. We arrange our engineer to Middle East jobsite for the first time mud system commissioning and the client is very familiar with the working process and maintenance and no need our coming in next 4 sets mud systems.
The mud system is equipped with below items.
1) Shale shaker GNZS703E-DZ
The shaker is GN mature shaker model which is used for over 5 years. Stable working performance and good price win the client’s good praise in past jobsite. The shale shaker is 3 panel shakers which is enough for Water well drilling or HDD project. If the client needs the long deck shaker with 4 panel screen, we can provide GNZS594E-HB shaker with replacement screen for Swaco Mongoose screen, both composite material and carbon steel material screen available.