Mud Solids Control Equipment – Page 29

Application of GN Cuttings Dryer in Oil-based Drill Drying Treatment Process

It is well known that oil-based mud is often used for drilling in shale gas drilling projects. The properties of the oil-based mud also determine that the oil-based drill cuttings are often much more difficult to handle than water-based cuttings and the cost is much higher. At this time, customers often choose to focus on oil-based drill cuttings.

Here we briefly introduce the application of the GN cuttings dryer to oil-based drill cuttings.

 

In the first step, the drill cuttings processed by solid-phase control equipment such as drilling fluid vibrating screens, de-sanders, and drilling fluid desilters are discharged into the cuttings box for unified collection during the drilling process, and the rock is lifted by a lift-swiveling forklift. Chip boxes loaded into the transport truck.

 

In the second step, according to the preset commuting route, the trucks will use the forklift trucks placed in trucks and transport them to the oil-based drill cuttings drying treatment plant.

 

In the third step, the oil-based drill cuttings are lifted and lifted by a rotary forklift to raise the cuttings box to the elevated funnel to dump the cuttings. The cuttings enter the elevated funnel and flow to the screw conveyor track, which can be adjusted by spirals. The conveyor controls the flow of cuttings and sends the cuttings evenly into the drill cuttings dryer. After the first treatment, the liquid phase is recovered by the liquid collection tank and stored in a primary treatment liquid collection tank.

 

In the fourth step, the solid waste is transported to the debris box through the screw conveyor at the bottom of the dryer for subsequent processing. The liquid phase after primary treatment is pumped into the high-speed mud centrifuge for secondary treatment via the screw pump on the collection tank, and the waste discharged from the mud outlet is collected in the cuttings box for treatment, and the liquid discharged from the discharge pipe of the centrifuge is discharged. The phase is a clean, recyclable white oil that is stored in a secondary treatment liquid collection tank.

 

Finally, the solid phases discharged from the spin dryer and the centrifuge are all stored in special debris boxes. After being collectively collected, they are loaded into trucks by lifting and rotating forklift trucks and transported by trucks to incineration plants, brick factories, cement plants, etc. Waste-producing manufacturers perform the final waste utilization or detoxification treatment.

Application of Centrifuge for Barite Recovery and Relationship between Parameters

The test data collected by the barite recovery system produced by our company shows that:

  1. Barite recycling centrifuge: The rotation speed is about 1800RPM, the “G” value is about 700, the low density separation point: 6 ~ 10μm, and the high density separation point: 4 ~ 10μm.

 

  1. Large-capacity centrifuge: The rotation speed is about 1900-2200 RPM, the “G” value is about 800, and the low-density separation point is 5-7 μm (not in the drilling fluid), which is used to exclude the low-density solid phase;

 

  1. High-speed centrifuge: The rotation speed is about 2500~3300 RPM, and the “G” value is about 1200~2100. The low-density separation point: 2~5μm is mainly used to remove the low-density content in the un-weighted drilling fluid.

The influence of various parameters of the centrifuge on the operation of the barite recovery system:

  1. Main engine rotation speed V: It is mainly used to control the size of the particle size of the separated particles. The higher the rotation speed, the smaller the particle size can be separated.

 

  1. Auxiliary machine (drum) speed V2: mainly used to control the pushing speed, the higher the speed, when the host speed is constant, due to the difference in speed [X = (V1-V2) / differential speed ratio] reduced ( V1: differential shaft input shaft speed), pushing material speed is reduced, at the same time, due to the reduction of pushing material speed, small particle size particles have settling time, which makes the proportion of small-size particles discharged out of the solid phase increase;

 

  1. Liquid supply volume: The amount of liquid supplied by the system determines the speed of the mud cleaning system to treat the drilling fluid, and it also affects the effect of barite recovery: the greater the amount of liquid supplied, the greater the amount of drilling fluid to be treated. The amount of barite that needs to settle during the time increases. When the sedimentation amount exceeds the system discharge amount, a part of the barite does not have enough time to settle, and the liquid phase separated by the centrifuge carries out the centrifuge system, thereby reducing the barite recovery rate. At the same time, as the amount of liquid supplied is increased, more barite is recovered, which may cause system operation failures, in particular, the increase of solid adherence on the screw feeder of the centrifuge, resulting in the balance of the centrifuge drum. Not enough but strong vibration and stuck.

 

  1. Meniscus: mainly controls the sediment thickness (liquid pool depth) in the drum of the mud centrifuge and the water content of the solids discharged, and affects the particle size: when the meniscus is completely removed (the height is lowest) The grit thickness (liquid pool depth) is the shallowest, the water content of the solids discharged is the lowest, and the content of small-size particles is the least, but at the same time the pushing load is increased. When the height of the meniscus is the highest, the thickness of the grit sand (the depth of the liquid pool) is the deepest, the water content of the solids discharged is the largest, the content of the small-size particles is the highest, and the pushing load is reduced. Therefore, the depth of the liquid pool must be properly adjusted when the treated drilling fluid contains a large amount of liquid and has a high viscosity.

More question,please contact GN solids control

Treatment of centrifuge drum plugging failure

GN GNLW series of mud centrifuges, also known as horizontal spiral discharge sedimentation centrifuge, mud centrifuge, is aiming at the characteristics of drilling mud, mud slurry recovery system designed for solid-liquid separation dedicated solid control equipment for oil and gas drilling mud , Sludge dewatering, particle size grading, food protein, starch, kaolin, natural gas desulfurization sludge, waste oil purification and other industries. The removal of fine solids, the reduction of solid content in the solid-liquid mixture, the control of drilling mud density, viscosity, ensuring drilling fluid performance and rapid drilling are all important.

Drilling mud centrifuge

Clogging a reason: centrifuge work process, due to the pump flow is too large, or suddenly increased suction density of the mud, causing the auxiliary motor trip, resulting in centrifuge blockage.

 

Blockage two reasons: Centrifuge shutdown, did not follow the rules carefully, there is no flushing, or flushing is not clean, resulting in centrifuge blockage.

 

If you start the auxiliary motor, if the differential, the drum followed by auxiliary motor rotation, and faster and faster, indicating that the material between the drum and the auger rinse is not complete or even blocked, can’t start the main motor, in this way Centrifuge to overcome blockage; material should be cleaned between drum and auger.

 

The specific method is: remove the shield, stuck with a pipe clamp Auxiliary motor coupling, to both positive and negative force, not to be brute force to prevent the differential ruined. Can also be injected into the slurry into the pipe, for 12 hours soaking, to help turn the motor coupling.

 

Open the collection box to clean up:

 

Per three days, the collection box should be opened for inspection and cleaning. The wear-resistant sleeve, scraper and end scraper on the slag outlet of the mainframe are both fragile and should be used with special care.

More question about decanter centrifuge or other solids control equipment,please contact us

GN Solids Control Waste Management system

GN solids control Skid-mounted waste treatment system is based on customer needs, in accordance with customer requirements for the treatment of mud after the design, manufacture for the recycling of waste sludge skid handling system. The main core equipment of this system is GNZS594E-HB high-frequency vibrating screen for coarse particle screening and GNLW363C-VFD high-speed decanter centrifuge (with 20-foot flocculation dosing system to improve the processing effect of centrifuge) and system Feed screw pump, skid mounted tank, mixer and so on. According to the specific requirements of customers on the discharge, you can adjust the dosage of different flocculation agents to ensure that the expected delivery of the material to achieve the desired effect.

System components and parameters:

The system has two warehouses: one is a pre-mixed screening warehouse, one is a centrifuge liquid collection warehouse; the whole system can be processed by a centrifuge to remove most of the solid particles above 2μm.
Premix screening silos equipped with a stirrer and heating lines to ensure adequate mixing feed and improve the degree of demulsification mixing agent.
System design mud capacity: 30 m3 / h, to adapt to the environment: -15 ° ~ 50 °
Adapt to mud viscosity: ≤ 45 S.
Adapt to climatic conditions: rain, snow, foggy weather.
Continuous operation at rated power.
Working height range: Normal working at altitude ≤2500 m, working efficiency at ≥2500 m above sea level.
All the equipment of the system is a mature technology and new product, and the technical performance meets the relevant requirements of SY / T5612-2007 Design Specification for Solid Phase Control Equipment for Oil Drilling Fluids.
Machine design is reasonable, compact structure, flexible combination, advanced technology, easy operation and maintenance, performance, safety and reliability.
System is easy to dispatch, transfer and transport, to meet the domestic and foreign road transport regulations.

More question about this system,please contact GN solids control

Chemical choose and control for sludge waste management solidification unit

Solidification unit is a kind of equipment used for final treatment of drilling cuttings.some time it was called stabilization unit,With the strict environmental protection regulations issued, most rig site has to consider further treat of the drilling cuttings to reduce the waste discharge and recover drilling fluids as much as possible. To make work environment friendly,The further treated drilling cuttings, due to containing of chemicals, cannot be discharged directly.

 

Normally,the solidifify will need Cement and lime,some special sludge will add chemical like PAM/blinding material/resin,to keep better solid work,and control harmful metal of drill cutting

Based on different sludge’s solidify time with chemical,GN add VFD adjustable motor for sludge/lime/absorber feeding conveyor ,for easier control solidification unit working progress

Treated material will become solid with in10~15 minutes after discharged from unit,the time can be control follow different sludge and chemical

 

Most important point for using solidification is clean it before push stop,the solids part will stick at internal surface of mixing tank,it will damage the screw and effect further running

 

Some area moisture degree is too high,we advice make sure lime tank dry enough when running,or it may meet stick things too and effect feeding

 

GN choose high quality motor for conveyor for longer system service life,for better arrange waste manage plan

More question,please feel free to contact GN solids control

Balance for decanter centrifuge

GN design decanter centrifuge for oil&gas drilling fluid solids control,also can use for water well drilling mud recycling,and we have success experience for HDD drilling,some mining slurry and river water recycling have need of centrifuge

When centrifuge working,the bowl speed will be very high,max speed will be around 3000RPM,if the centrifuge not at stable plant,the whole machine will shake,and tube and motor will be damaged by this speed,and keep balance for screw and main bowl,is very important

GN have protect design to keep centrifuge avoid complete damage for some time,but most time ,bowl speed too high,damage will still happen,even the centrifuge stop,prepare is always better

The electric current will raise when centrifuge not stable,the motor will request more power to keep bowl speed,if centrifuge working at this state for long time,the life of motor and control system will reduce a lot,and power waste will raise,we have met this before,and advice make check list,and do maintenance to save money for future fix cost

Before fluid feeding to centrifuge,we advice try keep the size of solids average enough,this also can help centrifuge running stable,and make better separation work

The user can build plant to fix centrifuge,this is good way to keep centrifuge work stable,and keep solids control work well

 

Hope every user get good separation by GN centrifuge,more info,please contact GN solids control

Maintenance for vacuum transfer pump main body

GN Vacuum pump is a good transfer way for solids control area

For vacuum pump service life longer, maintenance is the key segment to guarantee the vacuum pump running properly. It should be frequently to check and maintain the vacuum pump according to the instruction book. every vacuum pump package,this is the main measure to reduce the down time of the vacuum pump and keep equipment running properly all the time.

Points for maintenance

Requirement for maintenance staff

Should designate the technician who was trained with the vacuum pump technology to operate, manage and maintain the vacuum pump.

It’s only allowed for the designated and trained staff to operate and maintain the vacuum pump, and operate the equipment properly, strictly according to the operation use and maintenance procedure’s requirement

Purpose of maintenance

Vacuum should be periodically checked, maintained and serviced to guarantee the function and key parts and safeguard procedure of the vacuum pump under normal condition. And guarantee the vacuum pump working under good conditions and the guarantee the mechanical property and technical characteristic of the vacuum pump. Prolong the equipment longevity and lower the usage cost.

Maintenance method

A large scale maintenance should be done every 3 months, inspect the tank body, the usage of the combination of feed and suction pipe and discharge pipe, if found they are severely damaged,should exchange immediately.

Inspect if the exterior fasteners of the equipment are fastened properly once a month (600 hours)

Inspect the brake valve of air cylinder once a month(600 hours), if the movement is

flexible, if there is air leaking or water leaking, if there is block or leakage, should fix immediately.

Welcome to GN website to check more detail

Mud management/recycle system’s design

Drilling fluid was necessary for oil&gas drilling system,in some big HDD/TBM system,it was needed too

For the mud system’s design we need consider item as below:

1.hydrocyclone(desander/desliter)

When particle running at tydrocyclone,it will damage inwall of cone,normally the desander/desilter was made my metal material like gray iron or stainless steel,is hard enough,but service life will be short when treating some special mud,and fall off metal will effect density of mud,not suitable for some project

GN choose high quality PU material desander/desilter,to keep unit’s service life long enough,and keep mud’s state well

2.fluid surcafe balance

Most tank in solids control is top open design,the mud will freely move when overflow,GN have negative direction overflow design,untreated mud can’t move into clean mud,keep drilling work stable

3.cutting point

In some mini mud system,we will choose double deck shaker for solids control,the mesh’s choose was not like regular compound mode,the top deck need treat mud after hydrocyclone,the size should be small,the bottom deck is for untreated mud,size was bigger

4.total capacity

The mud cleaner can treat most mud and same tank’s top space,but in some condition,the solids part will carry more fluid after cleaner,because of not enough screen area,so in some deep drilling system,The desander and desiliter shoud install in different shaker,to keep treated solids more dry

5.tank volume

Some big dproject will need more fluid to support drilling,we will design longer storage tank,but with volume raise,the agitator/mud gun’s choose should be more,to keep mud mixing enough,like agitator’s impellar quantity will be 2,mud gun’s connect size should raise ,make mix power enough

GN will keep develop mud system,to bring better product for client

Shocking protection for solids control transportation

Shocking protection for solids control transportation is very important for equipment use,GN treat it seriously to give client best product

Most solids control equipment is working by physical way,and running by motor and bearing

For keep equipments running well and long service life,before shipment or transportation,must do necessary fix way to keep equipment stable,like decanter centrifuge/shale shaker/vertical cutting dryer

The shale shaker’s spring of basket is designed for work,when shipping by air/sea/truck,the sudden joit will damage it and the maintenance will need many cost and time

Most important work point of centrifuge is balance,if fixing bowl by bracer,it can keep main screw and bearing stable when transportation,raise service life of whole unit

Same like vertical cutting dryer,the most equipment related about motor and bearing,need keep stable state when transportation,to make sure the parts not damaged and keep balance

Some user didn’t know the shocking protection design of equipment,and cause the service life become very short by moving,so,the best way is apply the equipment supplier arrange engineer to jobsite and make lesson for everyone,it totally worth it,to reduce maintenance cost and better treatment result

There is some special shocking protect way like use deck to fix,like photo attached, Vertical cutting dryer with Mounted in a metal pallet during shipment,the pallet will remove when installing at skid

GN solids control will use professional design to give best protect for equipment,let client get perfect product

 

Control and set up of GN vacuum pump

GNSP Sludge Vacuum Pump is able to produce high vacuum up to 25”HG (Mercury Column) for transfer liquid, drilling cuttings, sludge and solids.

The pump is without any rotation items. With special structure design and powerful suction capability, it can be used at tough environmental for solids transfer, high working performance and less maintenance

It’s very important to learn right way to use the equipment,below was photo explain of vacuum pump

Manual control and setting of time controller

 

All valve will not move(open or close) after finished set 2 switch levers

Control switch lever as same as Form1,based on different use way and request,valve will change follow switch lever

Work mode Manual loading Manual unloading Auto
A/M Switch lever Switch to Manual Switch to Manual Switch to Auto
L/U Switch lever Switch to Loading Switch to Unloading Switch to Default
Gas gate valve Open Close
Feeding gate valve Open Close
Discharge gate valve Close Open
Gas jet tube ball valve Open Close
Discharge tube ball valve Close Open
Pressure number (Mpa) >0.55Mpa >0.55Mpa
Time test until 70% test until empty
Form 1

1.When loading mud,computing the time between vacuum tank empty to 70% full,to set L time controler

2.When unloading mud,computing the time between vacuum tank 70%full to empty,to set D time controler

3.The auto mode can go on when manual mode running well,control switch same to form1’s auto mode set

 

More detail,please contact GN solids control