Jul 23

Work over drilling rig mud system is also one kind of solids control system in drilling work. And GN Solids Control is professional at this kind of mud system. After 2 mud tank systems for workover drilling rig to Indonesia, and Drilling mud system and mud mixing system for Australia,  today Another 2 Sets XJ550 HP Petroleum Workover Drilling rig solids control mud system are finished within 40 days ready for delivery to Kazakhstan.

workover rig mud systemThe workover rig mud system is usually contains shale shaker, decanter centrifuge, and mud tank. The desander and desilter is optional, it depends on the environment you faced.

As you may have noticed, we have send the work over rig mud system to two different place, Indonesia and Kazakhstan. South, North,and Middle of the earth, hot and cold. GN Solids Control can supply all the equipments customized, wherever you are, Indonesia or Kazakhstan, south or north of the earth,or you are in the coldest area or hottest area, you need, and GN do it, what’s more, do it perfect! Continue reading »

  • Share/Bookmark

written by admin \\ tags: , , , , ,

Jul 02

Drilling mud & fluid conditioning systems is an important part of drilling work. And it always containing well control lines, solids control systems, fluids treatment equipments and fluids transfer equipment etc.. I list all of them below:

  • Solids control through shakers, centrifuges and desanders
  • Fluid treatment with mixers, hoppers, mud labs and chemical storage and handling systems
  • Fluid transfer equipment such as centrifugal pumps, agitators and mud pumps.
  • Interconnect piping and hoses
  • Electrical and instrumentation as required
  • Ancillary items such as walkways, handrails, stairs, work and office spaces and any other items required

Continue reading »

  • Share/Bookmark

written by admin \\ tags: , , , ,

Mar 08

The mixing and reserve mud tank is after :Drilling mud suction Tank(2) for the 1000HP (ZJ40) Drilling rig mud system.500 bbls. three (3) compartment reserve tank, 10’ wide x 8’ deep x 37’ long mounted on a 40’ skid per above general specifications and including:

Mixing and reserve tank compartment:

water tank

water tank

150 bbls mixing compartment

175 bbls reserve #1 compartment

175 bbls reserve #2 compartment

one (1) full partition with bottom equalizer on reserve tanks.

top grating includes tubing handrials and toe boards.

one (1) stair to ground with handrials.

removable walkway with handrials to suction tank.

one (1) 1’’ diameter x 25’ long valved water washdowen hose.

16’’ x 18’’ mud ditch with 10’’ dump gate to each compartment.

three (3) psi 10 hp mud agitator supplied and mounted on tank. two (2) in reserve tank compartment and one (1) in mixing compartment.

two (2) 3’’ bottom mud guns with butterfly valves.

three (3) 10’’ butterfly valve clean-out gates – one (1) each in compartment.

one (1) 12’’ bottom equalizer to suction tank.

two (2) 6’’ hopper to suck mix mud in any tank.

two (2) 8×6 centrifugal pumps with mechanical seals, each powered by a 100 hp, 1800 rpm, 480 volt, 3-phase, 60 hz xp ac motor supplied and mounted on tank porch for mud mix.

one (1) 12’’ dich connection to suction tank.

one (1) 6’’ mud gunning line connection to suction tank.

one (1) 2’’ water line connection to suction tank.

Mud Tank

by George Trist

Mud tank is a basic part of solids control system or other equipments alike. It is widely used. How mud tank works, it is a…
  • Share/Bookmark

written by GN solids Control \\ tags: ,