{"id":669,"date":"2009-11-02T07:34:01","date_gmt":"2009-11-02T14:34:01","guid":{"rendered":"http:\/\/oilfield.gnsolidscontrol.com\/?p=669"},"modified":"2009-11-02T07:34:01","modified_gmt":"2009-11-02T14:34:01","slug":"drilling-mud-cooler-for-drilling-mud-system","status":"publish","type":"post","link":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/2009\/11\/02\/drilling-mud-cooler-for-drilling-mud-system\/","title":{"rendered":"Drilling mud cooler for drilling mud system"},"content":{"rendered":"<p>As a <a title=\"Drilling mud system\" href=\"http:\/\/www.gnsolidscontrol.com\/drilling-mud-system\/\">drilling mud equipments and system manufacturer<\/a>, now we have an inquiry for drilling mud cooler to integrated into our drilling mud system.<\/p>\n<figure id=\"attachment_670\" aria-describedby=\"caption-attachment-670\" style=\"width: 300px\" class=\"wp-caption alignright\"><a href=\"http:\/\/oilfield.gnsolidscontrol.com\/wp-content\/uploads\/2009\/11\/Drilling-mud-Cooler.gif\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-670\" title=\"Drilling mud Cooler\" src=\"http:\/\/oilfield.gnsolidscontrol.com\/wp-content\/uploads\/2009\/11\/Drilling-mud-Cooler-300x174.gif\" alt=\"Drilling mud cooler\" width=\"300\" height=\"174\" \/><\/a><figcaption id=\"caption-attachment-670\" class=\"wp-caption-text\">Drilling mud cooler<\/figcaption><\/figure>\n<p><strong>The drilling mud cooler specifications:<\/strong><br \/>\n1. Mobile Drilling Mud Cooler<br \/>\n2. Minimum capacity is 900 GPM<br \/>\n3. The system completed by pumps &amp; piping for temperatures ( Bottom Hole<br \/>\nTemperature at End Section ) below :<br \/>\na. Type 1 well :<br \/>\n1. 26\u201d phase 112\u00b0F<br \/>\n2. 17\u201d1\/2 phase 200\u00b0F<br \/>\n3. 12\u201d1\/4 phase 265\u00b0F<br \/>\n4. 8\u201d1\/2 phase 280\u00b0F<br \/>\n5. 6\u201d phase 320\u00b0F @ 8600 ft TVD as TD<br \/>\nb. Type 2 well :<br \/>\n1. 26\u201d phase 112\u00b0F<br \/>\n2. 17\u201d1\/2 phase 190\u00b0F<br \/>\n3. 12\u201d1\/4 x 14\u201d1\/2 315\u00b0F<br \/>\n4. 12\u201d1\/4 phase 335\u00b0F<br \/>\n5. 8\u201d1\/2 phase 390\u00b0F<br \/>\n6. 6\u201d phase 410\u00b0F @ 12,100 ft TVD as TD<br \/>\nc. Type 3 well :<br \/>\n1. 26\u201d phase 96\u00b0F<br \/>\n2. 18\u201d1\/2 phase 112\u00b0F<br \/>\n3. 14\u201d1\/2&#215;17\u201d1\/2 175\u00b0F<br \/>\n4. 12\u201d1\/4&#215;14\u201d1\/2 275\u00b0F<br \/>\n5. 10\u201d5\/8 x 12\u201d1\/4 365\u00b0F<br \/>\n6. 8\u201d1\/2 phase 395\u00b0F<br \/>\n7. 6\u201d phase 415\u00b0F @ 12,200 ft TVD as TD<br \/>\nd. Type 4 well :<br \/>\n1. 26\u201d phase 96\u00b0F<br \/>\n2. 18\u201d1\/2 x 22\u201d 112\u00b0F<br \/>\n3. 17\u201d1\/2 x 20\u201d 160\u00b0F<br \/>\n4. 14\u201d1\/2 x 17\u201d1\/2 255\u00b0F<br \/>\n5. 12\u201d1\/4 x 14\u201d1\/2 265\u00b0F<br \/>\n6. 10\u201d5\/8 x 12\u201d1\/4 290\u00b0F<br \/>\n7. 8\u201d1\/2 phase 370\u00b0F<br \/>\n8. 6\u201d phase 425\u00b0F<br \/>\nIf anybody who is able to supply the<strong> drilling mud cooler<\/strong> in China for the drilling mud system, please feel free to contact us for more info about the <a title=\"Drilling mud equipments\" href=\"http:\/\/www.gnsolidscontrol.com\/hdd-equipment\/\">drilling mud<\/a> cooler.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As a drilling mud equipments and system manufacturer, now we have an inquiry for drilling mud cooler to integrated into our drilling mud system. The drilling mud cooler specifications: 1. Mobile Drilling Mud Cooler 2. Minimum capacity is 900 GPM 3. The system completed by pumps &amp; piping for temperatures ( Bottom Hole Temperature at &hellip; <a href=\"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/2009\/11\/02\/drilling-mud-cooler-for-drilling-mud-system\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Drilling mud cooler for drilling mud system&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[],"tags":[],"class_list":["post-669","post","type-post","status-publish","format-standard","hentry"],"_links":{"self":[{"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/posts\/669","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/comments?post=669"}],"version-history":[{"count":0,"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/posts\/669\/revisions"}],"wp:attachment":[{"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/media?parent=669"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/categories?post=669"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/tags?post=669"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}