{"id":2568,"date":"2014-06-10T23:22:09","date_gmt":"2014-06-11T06:22:09","guid":{"rendered":"http:\/\/oilfield.gnsolidscontrol.com\/?p=2568"},"modified":"2014-06-11T00:14:47","modified_gmt":"2014-06-11T07:14:47","slug":"how-to-achieve-zero-discharge-on-drilling-waste-management","status":"publish","type":"post","link":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/2014\/06\/10\/how-to-achieve-zero-discharge-on-drilling-waste-management\/","title":{"rendered":"How to achieve Zero Discharge on Drilling Waste Management"},"content":{"rendered":"<p><a title=\"drilling waste management\" href=\"http:\/\/www.gnsolidscontrol.com\/drilling-waste-management\/\" target=\"_blank\">Drilling waste management<\/a>\u00a0and zero discharge is a getting much popular recent years. It is important to get zero discharge on drilling waste management. \u00a0Many EPC company wanna source professional equipment and professional personnel on the potential projects with large profit. \u00a0The the drilling waste market\u00a0capacity can reach 17 billion before 2018, it is said.<\/p>\n<p><a title=\"solids control\" href=\"http:\/\/www.gnsolidscontrol.com\/equipments\/\" target=\"_blank\">GN Solids Control<\/a>\u00a0is leading manufacturer for \u00a0drilling waste management equipment &amp; solids control equipment; after some years experience accumulation, GN Solids Control can offer professional solution on drilling waste management and can answer the question most of the people faced with &#8221; How to achieve zero discharge on drilling waste management &#8220;. This chapter will give a comprehensive knowledge of drilling waste (OBM &amp; WBM) from three parts as below. And tell people how to achieve zero discharge on drilling waste management in Part 3.<\/p>\n<ol>\n<li>\u00a0Source of drilling waste<\/li>\n<li>Necessary drilling waste management equipment<\/li>\n<li>Treating process of drilling waste and How to achieve Zero discharge of drilling waste<\/li>\n<\/ol>\n<h3>Part 1: Source of drilling waste<\/h3>\n<p>Source 1: Drilling waste from oil based mud drilling operations. The assessment is yet to be conducted<\/p>\n<p>Souce 2:\u00a0Refinery waste: Most of it is waste water, sludge, and the usual refineries waste ingredients. The refinery waste will be first recovered from large ponds and for those ponds to be remediated to original status where we will plant them with trees.<\/p>\n<p>Source 3:\u00a0Storage tank sludge: The tanks are yet to be calculated in terms of number and storage capacity. However, they are estimated to exceed the 50 tanks mark.<\/p>\n<p>Source 4: Oil pits (there are many oil pits and waste management service company are trying to do land remediation to original state which means they will treat the crude to get it back to its crude status, soil back to soil and water to be recovered):<\/p>\n<p>Oil pit case from Iraq drilling waste management market:<\/p>\n<ul>\n<li>There are over 120 oil pits to be treated.<\/li>\n<li>More than 60% are emptied from crude and what is left is sludge and soil to be treated.<\/li>\n<li>Average sizes are 100 miters in length, 70 miters in width and 5 miters in depth.<\/li>\n<li>We will be dealing with all of them, the ones that have sludge and soil left and the ones that are still filled with crude.<\/li>\n<li>The base of all pits is earthen. No concrete nothing else but earthen.<\/li>\n<li>Our task is to treat all pits and remediate the land to original status where we will plant them with trees.<\/li>\n<\/ul>\n<p style=\"text-align: center;\"><a href=\"http:\/\/oilfield.gnsolidscontrol.com\/wp-content\/uploads\/2014\/06\/drilling-waste-management-rigsite.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter  wp-image-2569\" title=\"drilling waste management rigsite\" alt=\"drilling waste management rigsite\" src=\"http:\/\/oilfield.gnsolidscontrol.com\/wp-content\/uploads\/2014\/06\/drilling-waste-management-rigsite.jpg\" width=\"640\" height=\"338\" \/><\/a><\/p>\n<p style=\"text-align: center;\"><!--more--><\/p>\n<h3>Part 2: Necessary drilling waste management equipment<\/h3>\n<p>1#:\u00a0<a title=\"vertical cuttings dryer\" href=\"http:\/\/www.gnsolidscontrol.com\/video\/vertical-cuttings-dryer-water-based-mud-drilling-waste\" target=\"_blank\">Vertical cuttings dryer<\/a>:<\/p>\n<p>this is the first stage of OBM drilling waste management. It can separate the big waste solids particles above 5 to 100 microns. GN vertial-G dryer with samilar design to CSI dryer or Swaco dryer, have got good test report from CNPC jobsite.<\/p>\n<p>2#:\u00a0<a title=\"decanter centrifuge\" href=\"http:\/\/www.gnsolidscontrol.com\/decanting-centrifuge\/\" target=\"_blank\">Decanter Centrifuge<\/a>:<\/p>\n<p>this is the second stage of OBM drilling waste management. It can separate the fine solids above 2-5 microns. GN decanter centrifuge with similar design to Derrick DE1000 and Swaco 518HV, have got good working performance feedback from many customers.<\/p>\n<p>3#Necessary accessories equipment:<\/p>\n<p>Screw conveyor for transfer drilling waste, feeding pump for centrifuge, sludge tank to storage drilling waste etc.<\/p>\n<p style=\"text-align: center;\"><a href=\"http:\/\/oilfield.gnsolidscontrol.com\/wp-content\/uploads\/2014\/06\/Drilling-waste-management-equipment1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter  wp-image-2571\" title=\"Drilling waste management equipment\" alt=\"Drilling waste management equipment\" src=\"http:\/\/oilfield.gnsolidscontrol.com\/wp-content\/uploads\/2014\/06\/Drilling-waste-management-equipment1.jpg\" width=\"635\" height=\"454\" \/><\/a><\/p>\n<h3>Part 3:\u00a0How to achieve Zero Discharge on Drilling Waste Management<\/h3>\n<p>Step 1: \u00a0the drilling waste should be pumped or transferred to vertical cuttings dryer;<\/p>\n<p>Step 2: \u00a0the drilling waste should be treated by high speed decanter centrifuge<\/p>\n<p>Step 3: \u00a0the drilling liquid waste from vertical cuttings dryer and decanter centrifuge can be collected together by storage tank; the drilling solids waste from vertical cuttings dryer and decanter centrifuge can be collected together by sludge skip.( or cuttings box )<\/p>\n<p>Step 4: \u00a0the drilling liquid waste can be treated by Oil\/water separator and get pure water &amp; pure oil ; the drilling solids waste can be treated by Thermal Desorption Unit (TDU) to get pure oil &amp; dry solids.<\/p>\n<p>Below are chart for the whole process procedure.<\/p>\n<p style=\"text-align: center;\"><a href=\"http:\/\/oilfield.gnsolidscontrol.com\/wp-content\/uploads\/2014\/06\/how-to-achieve-zero-discharge.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter  wp-image-2572\" title=\"how to achieve zero discharge\" alt=\"how to achieve zero discharge\" src=\"http:\/\/oilfield.gnsolidscontrol.com\/wp-content\/uploads\/2014\/06\/how-to-achieve-zero-discharge.jpg\" width=\"640\" height=\"301\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>GN Solids Control is professional drilling waste management equipment manufacturer; after some years experience accumulation, GN Solids Control can offer professional solution on drilling waste management. This chapter will give a comprehensive knowledge of drilling waste (OBM &#038; WBM) :<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[],"tags":[],"class_list":["post-2568","post","type-post","status-publish","format-standard","hentry"],"_links":{"self":[{"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/posts\/2568","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/comments?post=2568"}],"version-history":[{"count":0,"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/posts\/2568\/revisions"}],"wp:attachment":[{"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/media?parent=2568"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/categories?post=2568"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/tags?post=2568"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}