{"id":1673,"date":"2011-03-04T18:07:25","date_gmt":"2011-03-05T01:07:25","guid":{"rendered":"http:\/\/oilfield.gnsolidscontrol.com\/?p=1673"},"modified":"2011-03-04T18:07:25","modified_gmt":"2011-03-05T01:07:25","slug":"workover-rig-equipments-and-operation","status":"publish","type":"post","link":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/2011\/03\/04\/workover-rig-equipments-and-operation\/","title":{"rendered":"Workover rig equipments and operation"},"content":{"rendered":"<p>Repairing an oil well sometimes requires a workover. It is commonly called by several names such as <a title=\"completion rig\" href=\"http:\/\/oilfield.gnsolidscontrol.com\/mobile-drilling-rigs-solids-control-equipments\/\">completion rig<\/a>, workover rig, or pulling unit.<\/p>\n<p>\u00a0<strong>Function of <a title=\"workover rig mud system\" href=\"http:\/\/oilfield.gnsolidscontrol.com\/workover-rig-mud-system\/\">workover rig<\/a><\/strong><strong><a title=\"workover rig mud system\" href=\"http:\/\/oilfield.gnsolidscontrol.com\/workover-rig-mud-system\/\">\u00a0<\/a><\/strong><\/p>\n<figure id=\"attachment_1674\" aria-describedby=\"caption-attachment-1674\" style=\"width: 300px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/oilfield.gnsolidscontrol.com\/wp-content\/uploads\/2011\/03\/workover-rig-equipments-and-material.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-1674\" title=\"workover rig equipments and material\" src=\"http:\/\/oilfield.gnsolidscontrol.com\/wp-content\/uploads\/2011\/03\/workover-rig-equipments-and-material-300x168.jpg\" alt=\"workover rig equipments and material\" width=\"300\" height=\"168\" \/><\/a><figcaption id=\"caption-attachment-1674\" class=\"wp-caption-text\">workover rig equipments and material<\/figcaption><\/figure>\n<p>In many cases, workover implies the removal and replacement of the production tubing string after the well has been killed and a workover rig has been placed on location. Through-tubing workover operations, using coiled tubing, snubbing or slickline equipment, are routinely conducted to complete treatments or well service activities that avoid a full workover where the tubing is removed. This operation saves considerable time and expense.<\/p>\n<p>\u00a0Companies that supply this type of equipment are Key Energy Services, Pool <a title=\"workover rig solids control equipment\" href=\"http:\/\/oilfield.gnsolidscontrol.com\/oil-field-drilling-rig-equipment-complete-list\/\">Workover Services<\/a>, and Basic Well Services.<\/p>\n<p>\u00a0Of all the problems that can occur during production, three stand out the most: equipment failure, wellbore problems, and saltwater disposal.<\/p>\n<p>\u00a0<strong><a title=\"wellbore problems\" href=\"http:\/\/www.lloydminsterheavyoil.com\/workover.htm\">WELLBORE PROBLEMS<\/a><\/strong><\/p>\n<p>\u00a0Sanding, formation damage, paraffin accumulation, oil-water emulsions, and corrosion are common wellbore problems.<\/p>\n<p>\u00a0GN workover rig solids control system is mainly used for sanding problem. The system can separate large particles sand from the drilling fluids so the drilling mud can be recycled for drilling and \u201ckill\u201dthe well. The working principle is to clean the drilling mud by 4 phase cleaning, they are <a title=\"shale shaker\" href=\"http:\/\/www.gnsolidscontrol.com\/shale-shaker\/\">shale shaker<\/a>, desander, desilter, <a title=\"decanter centrifuge supplier\" href=\"http:\/\/oilfield.gnsolidscontrol.com\/top-decanter-centrifuge-manufacturers-in-the-world\/\">decanter centrifuge<\/a>. But usually for workover operation, sometimes you can use a shale shaker and centrifuge only, because the sand size is not so large, but it needs to separate finer particles than oil&amp; gas drilling.<\/p>\n<p>\u00a0<strong>Sanding Problem<\/strong><\/p>\n<p><!--more-->\u00a0In wells which produce from loosely consolidated sandstone formations, a certain amount of sand is usually produced with oil. Continued accumulation of the sand in the wellbore will eventually cut the oil-producing rate and may even halt production altogether. If a well continues to present sanding problems, preventive action may be needed.<\/p>\n<p>\u00a0GN has sold many <a title=\"XJ350 workover rig\" href=\"http:\/\/www.gnsolidscontrol.com\/drilling\/xj350-workover-rig\/\">workover rig materials <\/a>and equipments to worldwide clients. For more information about these solids control systems for workover rig, pls check<a title=\"solid control\" href=\"www.gnsolidscontrol.com\/drilling-fluids\/two-more-sets-of-solids-control-system-to-indonesia\"> GN website<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Repairing an oil well sometimes requires a workover. It is commonly called by several names such as completion rig, workover rig, or pulling unit. \u00a0Function of workover rig\u00a0 In many cases, workover implies the removal and replacement of the production tubing string after the well has been killed and a workover rig has been placed &hellip; <a href=\"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/2011\/03\/04\/workover-rig-equipments-and-operation\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Workover rig equipments and operation&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[],"tags":[],"class_list":["post-1673","post","type-post","status-publish","format-standard","hentry"],"_links":{"self":[{"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/posts\/1673","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/comments?post=1673"}],"version-history":[{"count":0,"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/posts\/1673\/revisions"}],"wp:attachment":[{"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/media?parent=1673"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/categories?post=1673"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/tags?post=1673"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}