{"id":1368,"date":"2010-08-31T00:17:15","date_gmt":"2010-08-31T07:17:15","guid":{"rendered":"http:\/\/oilfield.gnsolidscontrol.com\/?p=1368"},"modified":"2010-08-31T23:35:52","modified_gmt":"2010-09-01T06:35:52","slug":"shale-shaker-for-zj-series","status":"publish","type":"post","link":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/2010\/08\/31\/shale-shaker-for-zj-series\/","title":{"rendered":"Shale Shaker for ZJ Series"},"content":{"rendered":"<p>Usually the <a title=\"drilling rig wiki\" href=\"http:\/\/en.wikipedia.org\/wiki\/Drilling_rig\">drilling rig<\/a> made in China are defined as ZJ Series. There are ZJ20 ZJ30 ZJ40 ZJ50 ZJ70, and because of the different capacity of the drilling rig required.<\/p>\n<h3>GNZS83-2 <a title=\"GN Shale Shaker\" href=\"http:\/\/www.gn-shale-shaker.com\">shale shaker<\/a> for ZJ20<\/h3>\n<figure id=\"attachment_452\" aria-describedby=\"caption-attachment-452\" style=\"width: 300px\" class=\"wp-caption alignright\"><a href=\"http:\/\/www.gnsolidscontrol.com\/shale-shaker\/\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-452 \" title=\"Linear-motion-shale-shaker\" src=\"http:\/\/oilfield.gnsolidscontrol.com\/wp-content\/uploads\/2009\/09\/Linear-motion-shale-shaker-300x225.jpg\" alt=\"Linear-motion-shale-shaker\" width=\"300\" height=\"225\" \/><\/a><figcaption id=\"caption-attachment-452\" class=\"wp-caption-text\">Linear motion shale shaker<\/figcaption><\/figure>\n<p>Usually for ZJ20 drilling rig, we use GNZS83-2 shale shaker, and the shaker under the <a title=\"Mud Cleaner\" href=\"http:\/\/www.gnsolidscontrol.com\/mud-cleaner\">mud cleaner<\/a> GNZJ83-2 is<\/p>\n<p>GNZS83-2, too. For the ZJ20 or 650HP drilling rig matched 90-100M3\/h <a title=\"mud tank system\" href=\"http:\/\/www.gnsolidscontrol.com\/mud-tank\/\">mud systems<\/a>.<\/p>\n<p>GNZS83-2 shale shaker is linear motion shale shaker holds about 80M3\/h  treating capacity, that means about 352GPM. It holds 2 shaker screens.  The screen area come to 1.8M2 or 9.5ft2. GNZS83-2 can be used in work  over drilling rigs mud system, shallow oil well drilling, such as ZJ20  rigs, as well as 100t <a title=\"hdd equipment\" href=\"http:\/\/www.gnsolidscontrol.com\/hdd-equipment\/\"><strong><em>HDD mud system<\/em><\/strong><\/a>.<!--more--><\/p>\n<p>Model\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 GNZS83-2<br \/>\nVibrating Mode\u00a0\u00a0\u00a0\u00a0\u00a0 Linear Motion<br \/>\nMotor Power\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 2X1.3kw<br \/>\nVibrating Strength\u00a0  \u22646.5G<\/p>\n<p>Double Amplitude\u00a0\u00a0\u00a0 5.5~6.0mm<\/p>\n<p>Treating Capacity \u00a0\u00a080m<sup>3<\/sup>\/h 352GPM<br \/>\nDeck Adjustment\u00a0\u00a0\u00a0\u00a0 0\u00b0~3\u00b0<br \/>\nPower\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 380V\/50HZ,460V\/60HZ<br \/>\nScreen area\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 1.8m<sup>2<\/sup><\/p>\n<p>Shaker Screen\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 830\u00d71080mm\u00d72 (40~250meshes)<\/p>\n<p>Weight\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 1300kg<\/p>\n<h3>GNZS63-3 shale shaker for ZJ30<\/h3>\n<p>GNZS63-3 is right for ZJ30 drilling rig, For ZJ30, the main parts are 2 sets GNZS63-3 Shale shakers, GNZJ63-3 Mud  cleaner holds <a title=\"desander \" href=\"http:\/\/www.gn-desander-desilter.com\">Desander<\/a> cones 10\u2033x2, while <a title=\"desilter\" href=\"http:\/\/www.gn-desander-desilter.com\">Dsilter<\/a> cones 4\u2033x10. Then  also the LWF450x842N <a title=\"decanter centrifuge\" href=\"http:\/\/www.gn-decanter-centrifuge.com\">Decanter centrifuge<\/a>, Mud mixing pump, mud  agitators, and <a title=\"muud tank\" href=\"http:\/\/www.gnsolidscontrol.com\/mud-tank\">tanks<\/a>.<\/p>\n<p>Model\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 GNZS63-3<br \/>\nVibrating Mode\u00a0\u00a0\u00a0\u00a0\u00a0 Linear Motion<br \/>\nMotor Power\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 2X1.5kw<br \/>\nVibrating Strength\u00a0  \u22647.0G<\/p>\n<p>Double Amplitude\u00a0\u00a0\u00a0 5.5~6.0mm<\/p>\n<p>Treating Capacity \u00a0 120m<sup>3<\/sup>\/h 528GPM<br \/>\nDeck Adjustment\u00a0\u00a0\u00a0\u00a0 -1\u00b0~5\u00b0<br \/>\nPower\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 380V\/50HZ,460V\/60HZ<br \/>\nScreen area\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 2.4m<sup>2<\/sup><\/p>\n<p>Shaker Screen\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 630\u00d71250mm\u00d73 (40~250meshes)<\/p>\n<p>Weight\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 1680kg<\/p>\n<h3>GNZS83-3 <a title=\"shale shaker\" href=\"http:\/\/www.gnsolidscontrol.com\/shale-shaker\">shale shaker<\/a> for ZJ40 ZJ50<\/h3>\n<p>GNZS83-3 Shale shaker is rather popular shale shaker either as  separated equipment or a part of mud system. 83-3\u00a0<a title=\"shale shaker for ZJ70\" href=\"http:\/\/www.gnsolidscontrol.com\/drilling-fluids\/zj70-solids-control-system-india\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-medium wp-image-1386\" title=\"shale shaker for ZJ70 India\" src=\"http:\/\/oilfield.gnsolidscontrol.com\/wp-content\/uploads\/2010\/08\/shale-shaker-for-ZJ70-300x225.jpg\" alt=\"shale shaker for ZJ70 India\" width=\"300\" height=\"225\" \/><\/a>holds about 140M3\/h  treating capacity.<\/p>\n<p>And it has 3 shaker screens as 830x1080mmx3 the <a title=\"shale shaker screen\" href=\"http:\/\/knol.google.com\/k\/george-trist\/shale-shaker-screens\/16pj4hwlcbz7j\/11\">shaker screen<\/a> area  will be 2.7M2. The shaker screens are same with 83-2 Shale sahker all of  them can be replaced by each other. And the types can be soft hook  strap, PWP, and PMD type.<\/p>\n<p>More specified information pls visit <a title=\"shale shaker\" href=\"http:\/\/www.gnsolidscontrol.com\/shale-shaker\/\">shale shaker in GN.<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Usually the drilling rig made in China are defined as ZJ Series. There are ZJ20 ZJ30 ZJ40 ZJ50 ZJ70, and because of the different capacity of the drilling rig required. GNZS83-2 shale shaker for ZJ20 Usually for ZJ20 drilling rig, we use GNZS83-2 shale shaker, and the shaker under the mud cleaner GNZJ83-2 is GNZS83-2, &hellip; <a href=\"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/2010\/08\/31\/shale-shaker-for-zj-series\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Shale Shaker for ZJ Series&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[],"tags":[],"class_list":["post-1368","post","type-post","status-publish","format-standard","hentry"],"_links":{"self":[{"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/posts\/1368","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/comments?post=1368"}],"version-history":[{"count":0,"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/posts\/1368\/revisions"}],"wp:attachment":[{"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/media?parent=1368"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/categories?post=1368"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/oilfield.gnsolidscontrol.com\/index.php\/wp-json\/wp\/v2\/tags?post=1368"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}