The Derrick DP 600 (Dual Pool 600 shale shaker)incorporates numerous patent pending technological advancements designed to meet and exceed the evolving needs of the drilling industry. Innovative dual concave screen frame, increased fluid-handling capacity, a newly designed screen compression system and an optional scalping deck combine to provide a new standard in screening equipment. Continue reading “Derrick DP600(Dual pool 600) shale shaker on CIPPE”
Oil and natural gas corp.today declared the finding of threeoil and gas this month, it has approved that they would invest Rs 3241 crore in developing Cluster-7 marginal fields in the western offshore.
ONGC said it discovered gas in a well drilled in East Godavari district in Andhra Pradesh.Oil and gasin a separate well in shallow waters off the Andhra coast.
Besides oil was discovered in Gujarat block, a company press statement.But ONGC did not give estimation of it.
To invest the discovered oil, the company board approved a capital expenditure of Rs 3241.03 in the first phase of development.
In the first phase, they plan to install four new fixed well platforms and drilling of 20 development wells from which the cumulative production of oil and gas for 16 years. And the production is expected to be 9.73 million tons and 4.52 billion cubic meters.
In their plan, the project is completed in 35 months later, and the first oil is expected in March,2010.
GN solids control, as an leader of the oil and gas associated industries, is very exciting to hear this, as the price of oil and gas is rising all the time, more exploitation is really needed.
As we all know, the urgent demand of oil and gas inspire the exploitation and drilling and also thesolids controletc. In GN solids control, weonly produce top quality products, and we really welcome the customers all over the world which needs solids control.
New Bomco F-1000 single acting triplex mud pump complete.New Bomco F-1000 single acting triplex mud pump complete with:
BOMCO Mud Pump
Rated power:1000hp
maximum speed:120rpm(at crankshaft)
stroke length:10”
fully enclosed machined and fabricated steel main frame
main frame with access covers over crosshead
area and inspection doors on each side
double helical pinion shaft and bull gear
machined forged steel crankshaft
self-adjustable and replaceable crosshead guides
individually forged steel interchangeable fluid end modules with quick change valve pot covers
new Ensco liners, pistons, polyurethane valves and seals
oil bath and positive flow lubrication system
suction and discharge manifolds
new bomco pulsation dumpner,5000 psi maximum
service pressure, 20-gallons surge capacity, 4” api 5000 ring joint connection Continue reading “BOMCO F-1000 single acting triplex mud pump”
Mud Control Equipment, usually referred as solids control system or solids control equipment. It contains shale shakers, sometime rig shakers, mud cleaners, decanting centrifuge and so on. In G.N. China, we always supply Fluids Processing SystemShale ShakerMud Cleaner Desander Desilter Decanting Centrifuge Vacuum Degasser, Sand Pump, Mud Gas Separator, Jet Mud Mixer, Mud Agitator, Shear Pump, Submersible, Slurry Pump, Flare Ignition Device, Mud Gun, Mud Tank, Oilfield Equipment Parts,
GN Solids Control-Tangshan Guanneng Machinery Equipment Co., Ltd. Is a China leading manufacturer specializing in complete line of equipments for mud control system.GN Drilling mud equipments are widely used in Oil & Gas Drilling , HDD Mud System and Slurry Separation Plant.
If you want to know why is removing solids from drilling mud so important, we can get more questions, but these questions help us to solve this question.
Firstly, we should know where is the solids from.
HA, when we drilling, the drilling mud take them out.
Remove cuttings from well
Suspend and release cuttings
Control formation pressures
Seal permeable formations
Maintain wellbore stability
Minimizing formation damage
Cool, lubricate, and support the bit and drilling assembly
Transmit hydraulic energy to tools and bit
Ensure adequate formation evaluation
Control corrosion (in acceptable level)
Facilitate cementing and completion
And then we can find the answer: We must get high quality drilling mud to ensure the drilling process.
Oil and Gas Drilling, Summarize in 2009 All Around the World
1.American Drilling Drops
American drilling drops, due to weak demand and lower prices. The price of oil and gas has fallen to two thirds of their summer 2008 levels. It’s unprofitable for many oil and gas producers. So many of them, cut back on oil and gas production also the investments.
2.Russian Drilling Increases
Oil prices in the second quarter amounted to over $ 60 a barrel. In response to growing international drilling company, Halliburton (HAL), Weatherford International (WFT) and Schlumberger NV(SLB). In particular, the company Halliburton (HAL) reported 27% growth in sales in Russia and a double-digit growth in Mexico, Norway and China.
3.Complex Africa
It helps that the area is geologically complex; with many quarries and offshore oil probably deep underground. Or that many countries have seen deposit wars and unrest. Somalia remains a non-go zone, Ethiopia and the Ogaden region in the east is a violent uprising against insurgents fighting. And during the civil war in Mozambique ended in 1992, it took time for them to fully recover.
Saliva Explorers mainly on prospects for peace in Somalia. Stocks in oil block licenses for two small oil companies, Africa and Oil Range Resources will hold 10 billion barrels. Nobody talks about oil production in Somalia in the near future, but analysts believe that oil companies may be less intimidated by the political risks that would be in the past.
They point to the oil production in southern Sudan, where the risk of a 20-year civil war ended in 2005, to be rekindled. In any case, there is a feeling that is to discover, said Aly Khan Satchu, a financial adviser who manages Rich management in Nairobi. The reality and the perception of risk can be reduced.
The mixing and reserve mud tank is after :Drilling mud suction Tank(2) for the 1000HP (ZJ40) Drilling rig mud system.500 bbls. three (3) compartment reserve tank, 10’ wide x 8’ deep x 37’ long mounted on a 40’ skid per above general specifications and including:
Mixing and reserve tank compartment:
water tank
150 bbls mixing compartment
175 bbls reserve #1 compartment
175 bbls reserve #2 compartment
one (1) full partition with bottom equalizer on reserve tanks.
top grating includes tubing handrials and toe boards.
one (1) stair to ground with handrials.
removable walkway with handrials to suction tank.
one (1) 1’’ diameter x 25’ long valved water washdowen hose.
16’’ x 18’’ mud ditch with 10’’ dump gate to each compartment.
three (3) psi 10 hp mud agitator supplied and mounted on tank. two (2) in reserve tank compartment and one (1) in mixing compartment.
two (2) 3’’ bottom mud guns with butterfly valves.
three (3) 10’’ butterfly valve clean-out gates – one (1) each in compartment.
one (1) 12’’ bottom equalizer to suction tank.
two (2) 6’’ hopper to suck mix mud in any tank.
two (2) 8×6 centrifugal pumps with mechanical seals, each powered by a 100 hp, 1800 rpm, 480 volt, 3-phase, 60 hz xp ac motor supplied and mounted on tank porch for mud mix.
one (1) 12’’ dich connection to suction tank.
one (1) 6’’ mud gunning line connection to suction tank.
one (1) 2’’ water line connection to suction tank.
500 bbls mud suction tank. three (3) compartment suction tank with two (2) 15’-6’’ long x 10’ wide x 8’ high suction
drilling mud suction tank
compartment and one (1) 8’ long x 10’ wide x 8’ high pill compartment mounted on a 40’ skid per above general spesifications and including:
top grating. includes tubing handrials and toe boards.
one (1) psi 10 hp mud agitator supplied and mounted in pill compartment.
one (1) psi 10 hp agrtator supplied mounted in each suction compartment.
three (3) 3’’ bottom mud guns with butterfly valves.
three (3) 10’’ butterfly valve clean-out gates – one (1) in each compartment.
two (2) 10’’ suction lines, one (1) for each mud pump. mud pump to be capable of suching from any compartment.
one (1) mud lap on suction tank with 1’’ water tap.
8’’ suction line in each compartment of the suction tank for mud mix. Continue reading “Drilling mud suction Tank(2)”